Determination of Mining Limits (ML) for each of Open-Pit (OP) and Underground (Ug) is one of the most significant part impacts the economic aspects. Optimization process for the mentioned objective in both of OP and Ug mining was done on the economic block model. In this paper, the applied Optimization Algorithms (OA)s for ML determination extensively were studied. Because of the major difference between the shape and form of mining limits in two main exploitation methods, implementation of the algorithms in searching and founding the mining limits for OP and Ug is also different
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...
An open-pit mine production planning begins with determining the ultimate pit limit of an open-pit m...
TEZ5553Tez (Yüksek Lisans) -- Çukurova Üniversitesi, Adana, 2005.Kaynakça (s. 57-59) var.viii, 60, [...
Determination of Mining Limits (ML) for each of Open-Pit (OP) and Underground (Ug) is one of the mos...
There are various Optimization techniques available and lots of literature has been published about ...
In this paper, the authors consider to the deposits which have potential for exploiting initially by...
There are occasionally deposits with a potential of exploiting by a combined mining of open pit and ...
The determination of optimum cutoff grade is influenced by the economic parameters (price of metal, ...
Many open pit (OP) mines with considerable vertical extent are approaching towards the end of their ...
Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploite...
In open-pit mining on a bench level, the dig-limit optimization problem is deciding whether to class...
Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained...
Dig-limit optimization is an operational decision-making problem that significantly affects the valu...
To date, the Republic of Uzbekistan requires the transition to the use of new equipment in mining en...
There are many deposits that have the potential to be mined by a combined method of open-pit and und...
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...
An open-pit mine production planning begins with determining the ultimate pit limit of an open-pit m...
TEZ5553Tez (Yüksek Lisans) -- Çukurova Üniversitesi, Adana, 2005.Kaynakça (s. 57-59) var.viii, 60, [...
Determination of Mining Limits (ML) for each of Open-Pit (OP) and Underground (Ug) is one of the mos...
There are various Optimization techniques available and lots of literature has been published about ...
In this paper, the authors consider to the deposits which have potential for exploiting initially by...
There are occasionally deposits with a potential of exploiting by a combined mining of open pit and ...
The determination of optimum cutoff grade is influenced by the economic parameters (price of metal, ...
Many open pit (OP) mines with considerable vertical extent are approaching towards the end of their ...
Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploite...
In open-pit mining on a bench level, the dig-limit optimization problem is deciding whether to class...
Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained...
Dig-limit optimization is an operational decision-making problem that significantly affects the valu...
To date, the Republic of Uzbekistan requires the transition to the use of new equipment in mining en...
There are many deposits that have the potential to be mined by a combined method of open-pit and und...
In the open-pit mining, one of the first decisions that must be made in production planning stage, a...
An open-pit mine production planning begins with determining the ultimate pit limit of an open-pit m...
TEZ5553Tez (Yüksek Lisans) -- Çukurova Üniversitesi, Adana, 2005.Kaynakça (s. 57-59) var.viii, 60, [...