The determination of the critical path (CP) in stochastic networks is difficult. It is partly due to the randomness of path durations and partly due to the probability issue of the selection of the critical path in the network. What we are confronted with is not only the complexity among random variables but also the problem of path dependence of the network. Besides, we found that CP is not necessarily the longest (or shortest) path in the network, which was a conventional assumption in use. The Program Evaluation and Review Technique (PERT) and Critical Path Index (CPI) approaches are not able to deal with this problem efficiently. In this study, we give a new definition on the CP in stochastic network and propose a modified label-correct...
Abstract The classical PERT approach uses the path with the largest expected duration as the critica...
AbstractRecently developed point-to-point relations have greatly extended the modeling capability of...
The problem of finding the distribution of the shortest path length through a stochastic network is ...
An algorithm is described for estimating arc and path criticalities in stochastic activity networks ...
In the present work, stochastic network models representing a project as a set of activities are stu...
The Critical Path Method (CPM) is one of several related techniques for planning and managing of com...
This paper describes a new procedure for estimating parameters of a stochastic activity network of N...
The length of the stochastic shortest path is defined as the arrival probability from a source node ...
This thesis targets the problem of critical path identification in sub-micron devices. Delays are de...
PERT and Critical Path techniques are enjoying exceptionally broad application in industrial and mil...
The first part of this dissertation is concerned with the study of the detailed structure of network...
AbstractCommon network parameters, such as number of nodes and arc lengths are frequently subjected ...
AbstractThis paper addresses the problem of finding reliable a priori shortest path to maximize the ...
This paper discusses the sensitivity of network flows to uncertain link state information for variou...
Abstract – By applying shortest path analysis in stochastic networks, we introduce a new approach to...
Abstract The classical PERT approach uses the path with the largest expected duration as the critica...
AbstractRecently developed point-to-point relations have greatly extended the modeling capability of...
The problem of finding the distribution of the shortest path length through a stochastic network is ...
An algorithm is described for estimating arc and path criticalities in stochastic activity networks ...
In the present work, stochastic network models representing a project as a set of activities are stu...
The Critical Path Method (CPM) is one of several related techniques for planning and managing of com...
This paper describes a new procedure for estimating parameters of a stochastic activity network of N...
The length of the stochastic shortest path is defined as the arrival probability from a source node ...
This thesis targets the problem of critical path identification in sub-micron devices. Delays are de...
PERT and Critical Path techniques are enjoying exceptionally broad application in industrial and mil...
The first part of this dissertation is concerned with the study of the detailed structure of network...
AbstractCommon network parameters, such as number of nodes and arc lengths are frequently subjected ...
AbstractThis paper addresses the problem of finding reliable a priori shortest path to maximize the ...
This paper discusses the sensitivity of network flows to uncertain link state information for variou...
Abstract – By applying shortest path analysis in stochastic networks, we introduce a new approach to...
Abstract The classical PERT approach uses the path with the largest expected duration as the critica...
AbstractRecently developed point-to-point relations have greatly extended the modeling capability of...
The problem of finding the distribution of the shortest path length through a stochastic network is ...