LecturePg. 51-62The design premise in upgrading two operating plants for more compression capability is discussed. The first is a syn gas plant designed for 1000 tons/day of methanol but converted to syn gas only for a primary acetic acid market. The upgrade concentrates on a carbon monoxide (CO) compressor train which upstaged an original pair of compounded centrifugal compressor casings (15 impellers) to a larger casing (first body), roughly four sizes larger at 14 impellers compound compressor casings( two). The new train uses an available larger horsepower steam turbine available from the previous process conversion and its concrete mezzanine and intercoolers located just south of the present CO train. The timetable called for conversi...
LecturePg. 25-38This paper presents some recent technical innovations to improve mechanical drive st...
LecturePg. 137-150The Frame 3 Gas Turbines have proven to be reliable drivers for pipeline compresso...
LecturePg. 45-50The solution to a chronic utility problem, with a critical natural gas compression u...
LecturePg. 19-30The successful justification, design, installation, and commissioning of new major m...
LecturePg. 105-120Major uprates of process compressor train performance can be achieved utilizing th...
LecturePg. 103-112Retrofits on compressors can become attractive if the operating requirements of a ...
PaperPg. 55-72.Each new project that a company initiates should allow the mechanical developments up...
LecturePg. 93-98Revamping the compression equipment in an ammonia plant can help optimize plant outp...
LecturePg. 93-100Current design technology applied to existing rotating equipment can produce signif...
LecturePg. 123-132Two similar large steam turbines in an ethylene plant are profiled. One drives the...
LecturePg. 77-84Reapplication of used power equipment can shorten project schedule and decrease capi...
LecturePg. 91-100The natural gas and chemical processing industries have historically and necessaril...
LecturePg. 119-128A six stage mechanical drive steam turbine rated at 13,300 hp was installed at a ...
LecturePg. 85-92The rerating possibilities of compressors are discussed. Starting from the character...
LecturePg. 31-36During the oil crisis in the 1970s, many electric utilities assigned their base load...
LecturePg. 25-38This paper presents some recent technical innovations to improve mechanical drive st...
LecturePg. 137-150The Frame 3 Gas Turbines have proven to be reliable drivers for pipeline compresso...
LecturePg. 45-50The solution to a chronic utility problem, with a critical natural gas compression u...
LecturePg. 19-30The successful justification, design, installation, and commissioning of new major m...
LecturePg. 105-120Major uprates of process compressor train performance can be achieved utilizing th...
LecturePg. 103-112Retrofits on compressors can become attractive if the operating requirements of a ...
PaperPg. 55-72.Each new project that a company initiates should allow the mechanical developments up...
LecturePg. 93-98Revamping the compression equipment in an ammonia plant can help optimize plant outp...
LecturePg. 93-100Current design technology applied to existing rotating equipment can produce signif...
LecturePg. 123-132Two similar large steam turbines in an ethylene plant are profiled. One drives the...
LecturePg. 77-84Reapplication of used power equipment can shorten project schedule and decrease capi...
LecturePg. 91-100The natural gas and chemical processing industries have historically and necessaril...
LecturePg. 119-128A six stage mechanical drive steam turbine rated at 13,300 hp was installed at a ...
LecturePg. 85-92The rerating possibilities of compressors are discussed. Starting from the character...
LecturePg. 31-36During the oil crisis in the 1970s, many electric utilities assigned their base load...
LecturePg. 25-38This paper presents some recent technical innovations to improve mechanical drive st...
LecturePg. 137-150The Frame 3 Gas Turbines have proven to be reliable drivers for pipeline compresso...
LecturePg. 45-50The solution to a chronic utility problem, with a critical natural gas compression u...