The ITER Electron Cyclotron Heating and Current Drive (ECH&CD) Upper Launcher, whose preliminary design was approved in 2009, is on its way towards the final design. The design work is being done by a consortium of several European research institutes in tight collaboration with F4E. The main focus is the finalization of the design of all components for the First Confinement System (FCS), which forms the vacuum and Tritium barrier. The FCS comprises structural components as well as the external waveguide components in the port cell. Structural components of the FCS include the flange seal, backend frame and closure plate. The external waveguide components include the isolation valve, CVD diamond windows, miter bends and straight wavegui...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
Abstract The design of the ITER electron cyclotron launchers recently reached the preliminary design...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
The ITER Electron Cyclotron Heating and Current Drive (ECH&CD) Upper Launcher, whose preliminary des...
Four ITER EC H&CD (Electron Cyclotron Heating and Current Drive) Upper Launchers will be install...
The design of the ITER ECRH system provides 20 MW millimeter wave power for central plasma ...
The design of the ITER ECRH system provides 20 MW millimeter wave power for central plasma heat...
The ITER Electron Cyclotron Heating and Current Drive Upper Launcher, developed by the ECHUL-CA Cons...
The challenge of developing the conceptual design of the ECH Upper Launcher system for MHD control i...
Four EC H&CD (Electron Cyclotron Heating and Current Drive) launchers will be installed into the...
Four EC H&CD (Electron Cyclotron Heating and Current Drive) launchers will be installed into the upp...
The design of the ITER electron cyclotron launchers recently reached the preliminary design level - ...
Four EC H&CD (Electron Cyclotron Heating and Current Drive) launchers will be installed into the upp...
The challenge of developing the conceptual design of the ECH Upper Launcher system for MHD control i...
The challenge of developing the conceptual design of the ECH Upper Launcher system for MHD control i...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
Abstract The design of the ITER electron cyclotron launchers recently reached the preliminary design...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
The ITER Electron Cyclotron Heating and Current Drive (ECH&CD) Upper Launcher, whose preliminary des...
Four ITER EC H&CD (Electron Cyclotron Heating and Current Drive) Upper Launchers will be install...
The design of the ITER ECRH system provides 20 MW millimeter wave power for central plasma ...
The design of the ITER ECRH system provides 20 MW millimeter wave power for central plasma heat...
The ITER Electron Cyclotron Heating and Current Drive Upper Launcher, developed by the ECHUL-CA Cons...
The challenge of developing the conceptual design of the ECH Upper Launcher system for MHD control i...
Four EC H&CD (Electron Cyclotron Heating and Current Drive) launchers will be installed into the...
Four EC H&CD (Electron Cyclotron Heating and Current Drive) launchers will be installed into the upp...
The design of the ITER electron cyclotron launchers recently reached the preliminary design level - ...
Four EC H&CD (Electron Cyclotron Heating and Current Drive) launchers will be installed into the upp...
The challenge of developing the conceptual design of the ECH Upper Launcher system for MHD control i...
The challenge of developing the conceptual design of the ECH Upper Launcher system for MHD control i...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
Abstract The design of the ITER electron cyclotron launchers recently reached the preliminary design...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...