Saturn 1B facilities, launch delay, and ground support equipment study for AAP launch contro
Advanced post-Saturn earth launch vehicle design and chemonuclear propulsion system performanc
Baseline definition and system optimization are used for the analysis of programmed holds developed ...
Saturn I, IB, and V launch vehicle progress - second stage launching, static test failure, fabricat...
Evaluation results of prelaunch countdown, powered flight, and orbital phase of Saturn S-4B-501 laun...
Computer simulation feasibility study for Saturn launch vehicle and support equipmen
The prelaunch and launch activities are described as they pertain to the S-IB (booster) stage of the...
Both the Department of Defense and NASA have clearly defined missions for the Saturn which cannot be...
Saturn V SA-513 (Skylab-1) was launched at 13:30:00 Eastern Daylight Time (EDT) on May 14, 1973, fro...
The Saturn V launch control and checkout system is based on demonstrated advanced techniques. The sy...
Computer program for evaluating space experiments for Saturn in-flight payloads - experiment desig
Structure, concepts, plan, operation, and construction of Saturn Experimental Payload Technical Eval...
Saturn I launch vehicle, Saturn IB launch vehicle, and Saturn V launch vehicle components and con...
Trajectory and dynamics analyses of Saturn 1B launch vehicle for Apollo-Saturn 205/CSM-101 missio
The results of the Saturn 1B, SA-208 launch vehicle flight evaluation are presented. The performance...
Flight safety requirements, restrictions, and instrumentation necessary for Apollo/Saturn 1B launche
Advanced post-Saturn earth launch vehicle design and chemonuclear propulsion system performanc
Baseline definition and system optimization are used for the analysis of programmed holds developed ...
Saturn I, IB, and V launch vehicle progress - second stage launching, static test failure, fabricat...
Evaluation results of prelaunch countdown, powered flight, and orbital phase of Saturn S-4B-501 laun...
Computer simulation feasibility study for Saturn launch vehicle and support equipmen
The prelaunch and launch activities are described as they pertain to the S-IB (booster) stage of the...
Both the Department of Defense and NASA have clearly defined missions for the Saturn which cannot be...
Saturn V SA-513 (Skylab-1) was launched at 13:30:00 Eastern Daylight Time (EDT) on May 14, 1973, fro...
The Saturn V launch control and checkout system is based on demonstrated advanced techniques. The sy...
Computer program for evaluating space experiments for Saturn in-flight payloads - experiment desig
Structure, concepts, plan, operation, and construction of Saturn Experimental Payload Technical Eval...
Saturn I launch vehicle, Saturn IB launch vehicle, and Saturn V launch vehicle components and con...
Trajectory and dynamics analyses of Saturn 1B launch vehicle for Apollo-Saturn 205/CSM-101 missio
The results of the Saturn 1B, SA-208 launch vehicle flight evaluation are presented. The performance...
Flight safety requirements, restrictions, and instrumentation necessary for Apollo/Saturn 1B launche
Advanced post-Saturn earth launch vehicle design and chemonuclear propulsion system performanc
Baseline definition and system optimization are used for the analysis of programmed holds developed ...
Saturn I, IB, and V launch vehicle progress - second stage launching, static test failure, fabricat...