In this paper the development of an extension module to the IWA/COST simulation benchmark to include expert reasoning is presented. This module enables the detection of suitable conditions for the development of settling problems of biological origin (filamentous bulking, foaming and rising sludge) when applying activated sludge control strategies to the simulation benchmark. Firstly, a flow diagram is proposed for each settling problem, and secondly, the outcome of its application is shown. Results of the benchmark for two evaluated control strategies illustrate that, once applied to the simulation outputs, this module provides supplementary criteria for plant performance assessment. Therefore, simulated control strategies can be evaluated...
Activated sludge simulation modelling is considered an accepted tool in engineering practice. Howeve...
This paper presents validation and implementation results of a benchmark developed for a specific fu...
The current work of developing a control simulation benchmark goes back to the work carried out with...
International audienceThe COST/IWA Benchmark Simulation Model No 1 (BSM1) has been available for alm...
The COST/IWA benchmark simulation model has been available for seven years. Its primary purpose has ...
The paper introduces the philosophy and current status of a benchmark for the evaluation of control ...
Over a decade ago, the concept of objectively evaluating the performance of control strategies by si...
To enhance development and acceptance of new control strategies in wastewater treatment plants, mode...
Wastewater treatment plants are large non-linear systems subject to large perturbations in wastewate...
Wastewater treatment plant operators encounter complex operational problems related to the activated...
The paper describes the development of a benchmark for the evaluation of control strategies in waste...
Wastewater treatment plants (WWTP) are complex systems that incorporate a large number of biological...
In this paper, implementation of the Benchmark Simulation Model No 2 (BSM2) within Matlab-Simulink i...
As the work of the IWA Task Group on Benchmarking of Control Strategies for wastewater treatment pla...
The main objective of this paper is to evaluate the effect of filamentous bulking sludge on the pred...
Activated sludge simulation modelling is considered an accepted tool in engineering practice. Howeve...
This paper presents validation and implementation results of a benchmark developed for a specific fu...
The current work of developing a control simulation benchmark goes back to the work carried out with...
International audienceThe COST/IWA Benchmark Simulation Model No 1 (BSM1) has been available for alm...
The COST/IWA benchmark simulation model has been available for seven years. Its primary purpose has ...
The paper introduces the philosophy and current status of a benchmark for the evaluation of control ...
Over a decade ago, the concept of objectively evaluating the performance of control strategies by si...
To enhance development and acceptance of new control strategies in wastewater treatment plants, mode...
Wastewater treatment plants are large non-linear systems subject to large perturbations in wastewate...
Wastewater treatment plant operators encounter complex operational problems related to the activated...
The paper describes the development of a benchmark for the evaluation of control strategies in waste...
Wastewater treatment plants (WWTP) are complex systems that incorporate a large number of biological...
In this paper, implementation of the Benchmark Simulation Model No 2 (BSM2) within Matlab-Simulink i...
As the work of the IWA Task Group on Benchmarking of Control Strategies for wastewater treatment pla...
The main objective of this paper is to evaluate the effect of filamentous bulking sludge on the pred...
Activated sludge simulation modelling is considered an accepted tool in engineering practice. Howeve...
This paper presents validation and implementation results of a benchmark developed for a specific fu...
The current work of developing a control simulation benchmark goes back to the work carried out with...