AbstractThis paper summarizes the final results of the pilot plant operation and R&D programme of the CO2 Catch-up project (2008- 2013). The objective of the CO2 Catch-up project is to demonstrate pre-combustion CO2 capture at the pilot plant in Buggenum, the Netherlands, in order to verify the technology performance and to generate knowledge in the form of validated models and operational experience
AbstractIn this status report we want to provide a comprehensive overview of the current status and ...
AbstractIn 2007 RWE Power, BASF and Linde entered into a cooperation to develop an optimized post co...
AbstractThis paper presents the results of system assessments that were conducted to compare convent...
AbstractThis paper summarizes the final results of the pilot plant operation and R&D programme of th...
This paper summarizes the final results of the pilot plant operation and R&D programme of the CO2 Ca...
AbstractIn the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was bu...
N.V. Nuon (part of the Vattenfall Group) operates an IGCC in Buggenum and is developing a multi-fuel...
AbstractN.V. Nuon (part of the Vattenfall Group) operates an IGCC in Buggenum and is developing a mu...
AbstractThis paper introduces the experiences from the operation of a pilot-scale pre-combustion CO2...
Pre-combustion CO2 capture applied to integrated gasification combined cycle (IGCC) power plants is ...
AbstractThe paper describes experimental results obtained with CO2 capture from a coal fired power p...
In the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was built and ...
AbstractThe EnBW post-combustion capture pilot plant at Heilbronn in Germany was built in 2010 and c...
AbstractFluor and E.ON have built a carbon dioxide recovery pilot plant using Fluor's proprietary Ec...
This study aims to provide insights into the design and operation of full-scale post-combustion CO2 ...
AbstractIn this status report we want to provide a comprehensive overview of the current status and ...
AbstractIn 2007 RWE Power, BASF and Linde entered into a cooperation to develop an optimized post co...
AbstractThis paper presents the results of system assessments that were conducted to compare convent...
AbstractThis paper summarizes the final results of the pilot plant operation and R&D programme of th...
This paper summarizes the final results of the pilot plant operation and R&D programme of the CO2 Ca...
AbstractIn the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was bu...
N.V. Nuon (part of the Vattenfall Group) operates an IGCC in Buggenum and is developing a multi-fuel...
AbstractN.V. Nuon (part of the Vattenfall Group) operates an IGCC in Buggenum and is developing a mu...
AbstractThis paper introduces the experiences from the operation of a pilot-scale pre-combustion CO2...
Pre-combustion CO2 capture applied to integrated gasification combined cycle (IGCC) power plants is ...
AbstractThe paper describes experimental results obtained with CO2 capture from a coal fired power p...
In the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was built and ...
AbstractThe EnBW post-combustion capture pilot plant at Heilbronn in Germany was built in 2010 and c...
AbstractFluor and E.ON have built a carbon dioxide recovery pilot plant using Fluor's proprietary Ec...
This study aims to provide insights into the design and operation of full-scale post-combustion CO2 ...
AbstractIn this status report we want to provide a comprehensive overview of the current status and ...
AbstractIn 2007 RWE Power, BASF and Linde entered into a cooperation to develop an optimized post co...
AbstractThis paper presents the results of system assessments that were conducted to compare convent...