AbstractThis paper presents an approach for determining the most appropriate technique for cost estimation of innovative high value manufacturing products depending on the amount of prior data available. Case study data from the United States Scheduled Annual Summary Reports for the Joint Strike Fighter (1997-2010) is used to exemplify how, depending on the attributes of a priori data certain techniques for cost estimation are more suitable than others. The data attribute focused on is the computational complexity involved in identifying whether or not there are patterns suited for propagation. Computational complexity is calculated based upon established mathematical principles for pattern recognition which argue that at least 42 data sets...
A mathematically advanced method for improving the fidelity of cost estimation for an engineering sy...
About 75% of the total product cost is determined in the early design phase, which means that the po...
Inaccurate cost estimates contribute to lost implementation opportunity of novel manufacturing techn...
This paper presents an approach for determining the most appropriate technique for cost estimation o...
AbstractThis paper presents an approach for determining the most appropriate technique for cost esti...
In practice the forecasting of cost uncertainty for high value manufacturing products is typically a...
Increasing competition and regulation are raising the pressure on manufacturing organisations to inn...
Novel high value manufacturing products by default lack the minimum a priori data needed for forecas...
AbstractNovel high value manufacturing products by default lack the minimum a priori data needed for...
Estimating cost of new technology intensive products is very ad hoc within the automotive industry. ...
Organised by: Cranfield UniversitySmall to medium manufacturing companies are coming to realise the ...
Cost information is important to all parties in the steel fabrication industry: owners; engineers; a...
This paper reports on the progress of the research and development of a data modelling and optimizat...
Cost estimation of new products has always been difficult as only few design, manufacturing and oper...
This paper presents a data modelling and a semi-automatic data searching method to support cost esti...
A mathematically advanced method for improving the fidelity of cost estimation for an engineering sy...
About 75% of the total product cost is determined in the early design phase, which means that the po...
Inaccurate cost estimates contribute to lost implementation opportunity of novel manufacturing techn...
This paper presents an approach for determining the most appropriate technique for cost estimation o...
AbstractThis paper presents an approach for determining the most appropriate technique for cost esti...
In practice the forecasting of cost uncertainty for high value manufacturing products is typically a...
Increasing competition and regulation are raising the pressure on manufacturing organisations to inn...
Novel high value manufacturing products by default lack the minimum a priori data needed for forecas...
AbstractNovel high value manufacturing products by default lack the minimum a priori data needed for...
Estimating cost of new technology intensive products is very ad hoc within the automotive industry. ...
Organised by: Cranfield UniversitySmall to medium manufacturing companies are coming to realise the ...
Cost information is important to all parties in the steel fabrication industry: owners; engineers; a...
This paper reports on the progress of the research and development of a data modelling and optimizat...
Cost estimation of new products has always been difficult as only few design, manufacturing and oper...
This paper presents a data modelling and a semi-automatic data searching method to support cost esti...
A mathematically advanced method for improving the fidelity of cost estimation for an engineering sy...
About 75% of the total product cost is determined in the early design phase, which means that the po...
Inaccurate cost estimates contribute to lost implementation opportunity of novel manufacturing techn...