AbstractIn this paper authors present methods currently used in construction for scheduling and tasks sequencing. Authors present sample construction problem. Basing on the example, authors compare selected metaheuristic algorithms (genetic algorithm and tabu search) in terms of construction projects’ indicators improvement. The outcomes are analyzed and discussed. The conclusions of the paper might also be used as a guidelines for implementation of presented methods in construction companies
This paper aims at solving the problem of minimising the construction project duration in determinis...
Time, cost and quality are used for measuring project success. So, they are considered the most impo...
The purpose of this study is to develop a genetic algorithm (GA) based software that can perform res...
This work deals with the application of artificial intelligence instruments in a building schedule. ...
The paper concerns the problem of roadworks scheduling executed in the flow-shop system. Works may b...
Due to the increase in the stakeholders and their objectives the construction projects have signific...
The article presents the cost optimization model for multiunit construction projects. Multiunit proj...
The construction project schedule is one of the most important tools for project managers in the Arc...
Construction projects play a vital role in shaping the built environment and have a significant impa...
Günümüzde iş dünyasında çok sayıda inşaat şirketinin bulunması ve inşaat sektörünün yatırımlarının g...
This research proposes a Genetic Algorithm based decision support model that provides decision maker...
AbstractA bi-level approach for optimisation of a construction project is discussed in the paper. Co...
Automating the development of construction schedules has been an interesting topic for researchers a...
Current socio-economic conditions impose certain requirements on construction and renovation project...
Driven by the severe competition within the construction industry, the necessity of improving and op...
This paper aims at solving the problem of minimising the construction project duration in determinis...
Time, cost and quality are used for measuring project success. So, they are considered the most impo...
The purpose of this study is to develop a genetic algorithm (GA) based software that can perform res...
This work deals with the application of artificial intelligence instruments in a building schedule. ...
The paper concerns the problem of roadworks scheduling executed in the flow-shop system. Works may b...
Due to the increase in the stakeholders and their objectives the construction projects have signific...
The article presents the cost optimization model for multiunit construction projects. Multiunit proj...
The construction project schedule is one of the most important tools for project managers in the Arc...
Construction projects play a vital role in shaping the built environment and have a significant impa...
Günümüzde iş dünyasında çok sayıda inşaat şirketinin bulunması ve inşaat sektörünün yatırımlarının g...
This research proposes a Genetic Algorithm based decision support model that provides decision maker...
AbstractA bi-level approach for optimisation of a construction project is discussed in the paper. Co...
Automating the development of construction schedules has been an interesting topic for researchers a...
Current socio-economic conditions impose certain requirements on construction and renovation project...
Driven by the severe competition within the construction industry, the necessity of improving and op...
This paper aims at solving the problem of minimising the construction project duration in determinis...
Time, cost and quality are used for measuring project success. So, they are considered the most impo...
The purpose of this study is to develop a genetic algorithm (GA) based software that can perform res...