AbstractThe Thames Estuary, Greater London represents a particularly challenging application for broad-scale strategic analysis of flood risk. It needs a robust flood model and comprehensive risk analysis framework to support the design of London's long-term flood risk management strategy. Traditionally, flood inundation modelling and risk analysis have to be performed by dividing the entire region into smaller disconnected flood plains due to the restriction of model capability and limitation of computational power. This approach essentially neglects the interaction of flood waves between different sub-floodplains and overlooks the broad-scale effects on flood risk. This work aims to test the High-Performance Integrated hydrodynamic Modell...
Our ability to quantify the likelihood of present-day extreme sea level (ESL) events is limited by t...
Aims: The impacts of catastrophic flooding have steadily increased over the last few decades. This w...
The Thames Estuary 2100 (TE2100) project requires an assessment of flood risk for present day and fu...
AbstractThe Thames Estuary, Greater London represents a particularly challenging application for bro...
The overall purpose of the Thames Estuary 2100 project is to develop a Flood Risk Management Plan f...
The Environment Agency is currently planning its long-term approach to Flood Risk Management within ...
The overall purpose of the Thames Estuary 2100 project is to develop a Flood Risk Management Plan fo...
Coastal regions are dynamic areas that often lie at the junction of different natural hazards. Extre...
PhD ThesisRecent large scale flood events in the UK and the continued threat of a major North Sea su...
Flooding is recognised as one of the most common and costliest natural disasters in England. Floodin...
Aims: The impacts of catastrophic flooding have steadily increased over the last few decades. This w...
Flooding is recognised as one of the most common and costliest natural disasters in England. Floodin...
Flooding is recognised as one of the most common and costliest natural disasters in England. Floodin...
This thesis applies coupled regional models to address coastal flood risk management needs in hyper-...
The Thames tidal defences are the UK’s most complex and costly flood defence system and of global si...
Our ability to quantify the likelihood of present-day extreme sea level (ESL) events is limited by t...
Aims: The impacts of catastrophic flooding have steadily increased over the last few decades. This w...
The Thames Estuary 2100 (TE2100) project requires an assessment of flood risk for present day and fu...
AbstractThe Thames Estuary, Greater London represents a particularly challenging application for bro...
The overall purpose of the Thames Estuary 2100 project is to develop a Flood Risk Management Plan f...
The Environment Agency is currently planning its long-term approach to Flood Risk Management within ...
The overall purpose of the Thames Estuary 2100 project is to develop a Flood Risk Management Plan fo...
Coastal regions are dynamic areas that often lie at the junction of different natural hazards. Extre...
PhD ThesisRecent large scale flood events in the UK and the continued threat of a major North Sea su...
Flooding is recognised as one of the most common and costliest natural disasters in England. Floodin...
Aims: The impacts of catastrophic flooding have steadily increased over the last few decades. This w...
Flooding is recognised as one of the most common and costliest natural disasters in England. Floodin...
Flooding is recognised as one of the most common and costliest natural disasters in England. Floodin...
This thesis applies coupled regional models to address coastal flood risk management needs in hyper-...
The Thames tidal defences are the UK’s most complex and costly flood defence system and of global si...
Our ability to quantify the likelihood of present-day extreme sea level (ESL) events is limited by t...
Aims: The impacts of catastrophic flooding have steadily increased over the last few decades. This w...
The Thames Estuary 2100 (TE2100) project requires an assessment of flood risk for present day and fu...