AbstractDue to various influence, some potential risks were hidden in water supply system. In order to control unexpected accidents, the fuzzy comprehensive evaluation method for risk assessment is adopted in this paper. The most serious risk internal cause of water supply system is water hammer, and to eliminate the potential risks of pipe burst, water hammer was calculated under various conditions, to identify pipeline weak sections. The submerged model of was established. According to the simulation of typical case, the plan of emergency was made to deal with a series of problems caused by pipeline rupture
In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk ...
AbstractThe relatively weak pipe or area of water distribution can be estimated by calculating the p...
The water environment treatment public-private partnership (PPP) project has a long cooperation peri...
AbstractDue to various influence, some potential risks were hidden in water supply system. In order ...
AbstractThe water hammer hazards are mainly in four aspects: the high water pressure bursting pipes,...
The paper proposes a model that evaluates the risk of a water distribution system looking to three a...
Water supply systems are usually designed, constructed, operated, and managed in an open environment...
It is recognised through current literature that contaminantin trusion is a primary threat leading t...
Critical infrastructure such as power and water delivery is growing rapidly in the developing world ...
AbstractBased on the characteristics of urban water supply system, the urban pipe network security a...
The South-to-North Water Diversion Project consists of long-distance water delivery channels and a c...
The build–own–operate–transfer (BOOT) scheme is widely used for the provision of new bulk water supp...
As governments embark on public-private partnerships (PPPs) to develop their water infrastructure, e...
Sufficient drinking water supply with acceptable quality has been one of the important challenges th...
Water distribution systems are the most expensive part of the water supply infrastructure system. In...
In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk ...
AbstractThe relatively weak pipe or area of water distribution can be estimated by calculating the p...
The water environment treatment public-private partnership (PPP) project has a long cooperation peri...
AbstractDue to various influence, some potential risks were hidden in water supply system. In order ...
AbstractThe water hammer hazards are mainly in four aspects: the high water pressure bursting pipes,...
The paper proposes a model that evaluates the risk of a water distribution system looking to three a...
Water supply systems are usually designed, constructed, operated, and managed in an open environment...
It is recognised through current literature that contaminantin trusion is a primary threat leading t...
Critical infrastructure such as power and water delivery is growing rapidly in the developing world ...
AbstractBased on the characteristics of urban water supply system, the urban pipe network security a...
The South-to-North Water Diversion Project consists of long-distance water delivery channels and a c...
The build–own–operate–transfer (BOOT) scheme is widely used for the provision of new bulk water supp...
As governments embark on public-private partnerships (PPPs) to develop their water infrastructure, e...
Sufficient drinking water supply with acceptable quality has been one of the important challenges th...
Water distribution systems are the most expensive part of the water supply infrastructure system. In...
In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk ...
AbstractThe relatively weak pipe or area of water distribution can be estimated by calculating the p...
The water environment treatment public-private partnership (PPP) project has a long cooperation peri...