AbstractLarge transportation projects have been afflicted by poor cost estimates and large cost overruns. This paper uses transit projects in the United States as an example to develop a probabilistic methodology for establishing sufficient contingency. Contingency is a reserve budget for coping with risks and uncertainties and to help keep the projects on budget. The premise of the proposed methodology is that accuracy of cost estimate is affected by project complexity. Also, this paper contends that there is an inherent underestimate in cost estimates because the estimator estimates components’ costs based on the modes (most likely values) of cost distributions and then adds up these modes to arrive at total cost. In fact, the means of th...
In our study, we examine in depth the role of Contingency Re-serve and methods for its calculation i...
Purpose Project-based industries face major challenges in controlling project cost and completing w...
Risk analysis plays a vital role in controlling and managing cost overruns in complex construction p...
The cost performance of building construction projects is a key success criterion for project sponso...
This paper presents a probabilistic method to establish schedule contingency levels based on percent...
Contingency is a ubiquitous component of project cost estimating. This paper provides a review of th...
Projects require budgets to set the sponsor’s financial commitment and provide the basis for cost co...
Research was conducted for the FTA Office of Program Management to refine contingency estimation and...
Transport projects are regularly subjected to cost misperformance. The contingency set aside to cove...
AbstractDue to risks and uncertainties associated with construction projects, owner agencies usually...
Construction projects, in nature, are complex and dynamic, therefore, when estimating the project bu...
154 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2006.With the increasing size and ...
In construction projects, contingency is the budget which is made available to cope with uncertainti...
© 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a p...
Patrascu (1988) observed nearly two decades ago that "contingency is probably the most misunderstood...
In our study, we examine in depth the role of Contingency Re-serve and methods for its calculation i...
Purpose Project-based industries face major challenges in controlling project cost and completing w...
Risk analysis plays a vital role in controlling and managing cost overruns in complex construction p...
The cost performance of building construction projects is a key success criterion for project sponso...
This paper presents a probabilistic method to establish schedule contingency levels based on percent...
Contingency is a ubiquitous component of project cost estimating. This paper provides a review of th...
Projects require budgets to set the sponsor’s financial commitment and provide the basis for cost co...
Research was conducted for the FTA Office of Program Management to refine contingency estimation and...
Transport projects are regularly subjected to cost misperformance. The contingency set aside to cove...
AbstractDue to risks and uncertainties associated with construction projects, owner agencies usually...
Construction projects, in nature, are complex and dynamic, therefore, when estimating the project bu...
154 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2006.With the increasing size and ...
In construction projects, contingency is the budget which is made available to cope with uncertainti...
© 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a p...
Patrascu (1988) observed nearly two decades ago that "contingency is probably the most misunderstood...
In our study, we examine in depth the role of Contingency Re-serve and methods for its calculation i...
Purpose Project-based industries face major challenges in controlling project cost and completing w...
Risk analysis plays a vital role in controlling and managing cost overruns in complex construction p...