Line-of-Balance is a graphical technique which can be used to plan and manage work flow. It is suit-able for construction projects because of their large degree of repetition. Despite its strengths Line-of-Balance has not gained widespread use in construction industry internationally. However, it has been used as the principal scheduling tool in Finland since 1980s. As a result of two decades of research and use in industry, a comprehensive schedule planning and control system has been developed around lo-cation-based techniques. A computer software has facilitated implementation in construction companies. This paper describes a case study of 15,000 m2 office building project using location-based methods for schedule planning and control. M...
Although line-of-balance (LOB) scheduling can be superior to bar charts and networks in repetitive-u...
The topic of this thesis was construction management and improving the production control processes ...
Line of Balance is an effective scheduling method used on projects with repetitive work. The Line of...
Line-of-Balance has been successfully used as the principal scheduling tool in large construction co...
Flowline, or Line-of-Balance, has recently gained attention in Lean Construction literature because ...
The construction industry has been relying on the Critical Path Method scheduling technique (CPM) to...
A computerized system to schedule high-rise building construction has been developed using line-of-b...
In linear construction projects like high rise buildings, roadways, pipelines where activities are r...
AbstractLine-of-Balance (LOB) is a useful analytical tool for repetitive activities in construction ...
Now a day’s there is dramatic change from traditional to digital information processing in construct...
This master thesis is a study of the location-based management systems (LBMS) in construction projec...
This paper reports one aspect of a research program devoted to the topic of production control in mu...
The increase in populations throughout the past years introduced the need for improving and increasi...
This report describes the theory of formula-based Line of Balance and the two extrer,e Line of Balan...
The paper suggests that ‘management by exception’ is an historical default control mechanism based o...
Although line-of-balance (LOB) scheduling can be superior to bar charts and networks in repetitive-u...
The topic of this thesis was construction management and improving the production control processes ...
Line of Balance is an effective scheduling method used on projects with repetitive work. The Line of...
Line-of-Balance has been successfully used as the principal scheduling tool in large construction co...
Flowline, or Line-of-Balance, has recently gained attention in Lean Construction literature because ...
The construction industry has been relying on the Critical Path Method scheduling technique (CPM) to...
A computerized system to schedule high-rise building construction has been developed using line-of-b...
In linear construction projects like high rise buildings, roadways, pipelines where activities are r...
AbstractLine-of-Balance (LOB) is a useful analytical tool for repetitive activities in construction ...
Now a day’s there is dramatic change from traditional to digital information processing in construct...
This master thesis is a study of the location-based management systems (LBMS) in construction projec...
This paper reports one aspect of a research program devoted to the topic of production control in mu...
The increase in populations throughout the past years introduced the need for improving and increasi...
This report describes the theory of formula-based Line of Balance and the two extrer,e Line of Balan...
The paper suggests that ‘management by exception’ is an historical default control mechanism based o...
Although line-of-balance (LOB) scheduling can be superior to bar charts and networks in repetitive-u...
The topic of this thesis was construction management and improving the production control processes ...
Line of Balance is an effective scheduling method used on projects with repetitive work. The Line of...