The postflight trajectory is presented for the Apollo/Saturn V AS-512 flight. An analysis is include...
Flight safety requirements, restrictions, and instrumentation for Apollo/Saturn 1B fligh
Dynamic structural analysis, statistical analysis, and Rayleigh-Ritz methods applied to Skylab and A...
Evaluation results of prelaunch countdown, powered flight, and orbital phase of Saturn S-4B-501 laun...
Safe destruct time and range safety time delay for Saturn 1B and Saturn 5 from pad to 40,000 fee
Flight safety requirements, restrictions, and instrumentation necessary for Apollo/Saturn 1B launche
Experimental static aerodynamic data for Apollo, Saturn 5 launch vehicle configuration
Systems analyses, prelaunch countdown, powered flight, and orbital phases of Saturn-4B-504
Saturn 8, 9, and 10 launch vehicles - dispersions and application to nominal trajectory, mission obj...
Trajectory and dynamics analyses of Saturn 1B launch vehicle for Apollo-Saturn 205/CSM-101 missio
The results of the Saturn 1B, SA-208 launch vehicle flight evaluation are presented. The performance...
The performance evaluation of the SA-206 launch vehicle for the Skylab 2 launch is presented. Flight...
Monte Carlo method for S-IC control engine-out condition study on Saturn 5 launch vehicl
Malfunctions defining impending abort situation for Saturn 5 launch trajectory to attain contingency...
Trajectory optimization for Saturn I /SA-8/ LAUNCH vehicle to place S- IV stage and payload in ell...
The postflight trajectory is presented for the Apollo/Saturn V AS-512 flight. An analysis is include...
Flight safety requirements, restrictions, and instrumentation for Apollo/Saturn 1B fligh
Dynamic structural analysis, statistical analysis, and Rayleigh-Ritz methods applied to Skylab and A...
Evaluation results of prelaunch countdown, powered flight, and orbital phase of Saturn S-4B-501 laun...
Safe destruct time and range safety time delay for Saturn 1B and Saturn 5 from pad to 40,000 fee
Flight safety requirements, restrictions, and instrumentation necessary for Apollo/Saturn 1B launche
Experimental static aerodynamic data for Apollo, Saturn 5 launch vehicle configuration
Systems analyses, prelaunch countdown, powered flight, and orbital phases of Saturn-4B-504
Saturn 8, 9, and 10 launch vehicles - dispersions and application to nominal trajectory, mission obj...
Trajectory and dynamics analyses of Saturn 1B launch vehicle for Apollo-Saturn 205/CSM-101 missio
The results of the Saturn 1B, SA-208 launch vehicle flight evaluation are presented. The performance...
The performance evaluation of the SA-206 launch vehicle for the Skylab 2 launch is presented. Flight...
Monte Carlo method for S-IC control engine-out condition study on Saturn 5 launch vehicl
Malfunctions defining impending abort situation for Saturn 5 launch trajectory to attain contingency...
Trajectory optimization for Saturn I /SA-8/ LAUNCH vehicle to place S- IV stage and payload in ell...
The postflight trajectory is presented for the Apollo/Saturn V AS-512 flight. An analysis is include...
Flight safety requirements, restrictions, and instrumentation for Apollo/Saturn 1B fligh
Dynamic structural analysis, statistical analysis, and Rayleigh-Ritz methods applied to Skylab and A...