Much research effort to date has focused on the development and use of bidding models in optimizing contractors ’ bid prices in competitive tendering environments. The objective of such models, incorporating all the complexity associated with modelling a project’s revenue and its costs, has been to maximize a project’s profit. Unbalanced bidding models, permitting differentiated mark-up to all of a project’s items of work, have also been unnecessary complicated by incorporating consideration of a project’s item costs. It is shown here that unbalanced bidding models have been unnecessarily complicated by incorporating consideration of a project’s item costs. Bidding models can be significantly simplified by having the objective of maximizing...
Two envelope fee bidding is a mechanism used by construction clients to allocate commissionsto willi...
Unbalanced bidding is a common practice used in both unit price and lump sum contracts. Contractors ...
Unbalanced bidding describes the process of contractors deliberately applying different mark-ups to ...
Unbalanced construction bidding covers different allocations of mark-up between contract project ite...
Unbalanced bidding, also known as skewed bidding, is the process of increasing and/or decreasing the...
by Kwong Wing Kie.Bibliography : leaf 30Thesis (M.B.A.)--Chinese University of Hong Kong, 198
The outline of a proposed new unbalanced bidding model is discussed. Background is provided as regar...
There are two major problems that affect bidding efficiency: unbalanced bidding and collusive biddin...
We consider tenders/auctions for the procurement of items that do not exist at the time of the tende...
The approach used by construction companies to determine bid prices is an element of their strategy ...
This paper examines the case of a procurement auction for a single project, in which the breakdown o...
AbstractBased on anecdotal evidence,claims are made that unbalanced bidding is a serious problem in ...
Based on anecdotal evidence, claims are made that unbalanced bidding is a serious problem in the con...
The low-bid method, typically used for competitive bidding in the United States, may result in a con...
The low bid method has been the most common competitive bid selection approach used for public proje...
Two envelope fee bidding is a mechanism used by construction clients to allocate commissionsto willi...
Unbalanced bidding is a common practice used in both unit price and lump sum contracts. Contractors ...
Unbalanced bidding describes the process of contractors deliberately applying different mark-ups to ...
Unbalanced construction bidding covers different allocations of mark-up between contract project ite...
Unbalanced bidding, also known as skewed bidding, is the process of increasing and/or decreasing the...
by Kwong Wing Kie.Bibliography : leaf 30Thesis (M.B.A.)--Chinese University of Hong Kong, 198
The outline of a proposed new unbalanced bidding model is discussed. Background is provided as regar...
There are two major problems that affect bidding efficiency: unbalanced bidding and collusive biddin...
We consider tenders/auctions for the procurement of items that do not exist at the time of the tende...
The approach used by construction companies to determine bid prices is an element of their strategy ...
This paper examines the case of a procurement auction for a single project, in which the breakdown o...
AbstractBased on anecdotal evidence,claims are made that unbalanced bidding is a serious problem in ...
Based on anecdotal evidence, claims are made that unbalanced bidding is a serious problem in the con...
The low-bid method, typically used for competitive bidding in the United States, may result in a con...
The low bid method has been the most common competitive bid selection approach used for public proje...
Two envelope fee bidding is a mechanism used by construction clients to allocate commissionsto willi...
Unbalanced bidding is a common practice used in both unit price and lump sum contracts. Contractors ...
Unbalanced bidding describes the process of contractors deliberately applying different mark-ups to ...