running-in is scheduled for spring 1972, is to provide lOI Protons per pulse with a high phase space densityl. The control and data acquisition of the four PSB rings are largely independent of each other, although their operation is to be synchronized with the 50 MeV linac (which serves as an injector) and the CPS (into which the PSB beam is transferred). Many of the control and measurement tasks will be performed with the aid of a computer which is shared with the linac and the CPS. The selection of a central computer operating with the Multiprogramming Operating Executive System (MPX) was made as an optimum compromise between efficiency and economy (e.g. sharing of existing facilities). A large number of analog functions will be generated...
In the commissioning of KEKB e 8GeV / e+ 3.5GeV linac the accelerator control system was much impro...
The old SPS RF control system designed in 1972 has been replaced completely, hardware and software. ...
A graphic-based realtime control system is developed and used for commissioning and operation of the...
A 70 GeV Proton Synchrotron Extracted Beam Lines Control System is described. About 130 Magnet Dipol...
Most of the physics experiments performed at CERN require protons with an energy of 28 GeV. This is ...
Guidelines for building the control system of the first synchrotron radiation source in Thailand, na...
As the list of digitized data signals re-quired by accelerator users and operators grows, it becomes...
The beam control renovation project for CERN’s PS Booster (PSB) was started in autumn 2008. Its aim ...
The original manual control system for the 12 neutral beam injectors on the 2XIIB Machine is being i...
Université : Faculté des sciences de l'Université de GrenobleAn IBM 1800 computer has been installed...
The CERN PS complex (CPS) comprises three accelerators in series: the 50 MeV Linac, the 800 MeV Boos...
In the commissioning of KEKB 8GeV / 3.5GeV linac the accelerator control system was much impr...
DESY has nine accelerators in operation. The reliable and operator-friendly control of these acceler...
A computer system has been developed at SLAC in the beam switchyard for on-line beam transport contr...
Implementation of a high performance computer control system tailored to the requirements of the Sup...
In the commissioning of KEKB e 8GeV / e+ 3.5GeV linac the accelerator control system was much impro...
The old SPS RF control system designed in 1972 has been replaced completely, hardware and software. ...
A graphic-based realtime control system is developed and used for commissioning and operation of the...
A 70 GeV Proton Synchrotron Extracted Beam Lines Control System is described. About 130 Magnet Dipol...
Most of the physics experiments performed at CERN require protons with an energy of 28 GeV. This is ...
Guidelines for building the control system of the first synchrotron radiation source in Thailand, na...
As the list of digitized data signals re-quired by accelerator users and operators grows, it becomes...
The beam control renovation project for CERN’s PS Booster (PSB) was started in autumn 2008. Its aim ...
The original manual control system for the 12 neutral beam injectors on the 2XIIB Machine is being i...
Université : Faculté des sciences de l'Université de GrenobleAn IBM 1800 computer has been installed...
The CERN PS complex (CPS) comprises three accelerators in series: the 50 MeV Linac, the 800 MeV Boos...
In the commissioning of KEKB 8GeV / 3.5GeV linac the accelerator control system was much impr...
DESY has nine accelerators in operation. The reliable and operator-friendly control of these acceler...
A computer system has been developed at SLAC in the beam switchyard for on-line beam transport contr...
Implementation of a high performance computer control system tailored to the requirements of the Sup...
In the commissioning of KEKB e 8GeV / e+ 3.5GeV linac the accelerator control system was much impro...
The old SPS RF control system designed in 1972 has been replaced completely, hardware and software. ...
A graphic-based realtime control system is developed and used for commissioning and operation of the...