Operational building performance often fails to meet that predicted at the design stage by as much as two to three times. Many reasons for this difference have been identified and widely reported, however, the problem still continues to occur. A case study new 'energy efficient' fully air conditioned office building has been monitored since occupation in June 2010 to observe the difference between operational energy consumption and design targets. In the first full year of operation (2011) the building consumed 208.7 kWh m-2 yr-1, 83% of the expected energy consumption (250 kWh m-2 yr-1). This dropped further to 176.1 kWh m-2 yr-1 in 2012 (70% below expected). Factors affecting building energy consumption have been discussed and appraised i...
Designers develop high-performance office building designs with efficient envelopes, and Heating, Ve...
Operational energy consumption in buildings has a crucial impact on global energy consumption. Never...
The extensively refurbished heritage government department office building in Canberra's Parliamenta...
With the increasing demand for more energy efficient buildings, the construction industry is faced w...
With the increasing demand for more energy efficient buildings, the construction industry is faced w...
There is significant evidence to suggest that buildings do not perform as well as expected, and this...
Measurements of completed projects confirm significant gaps between the predicted and actual energy ...
Simulation is commonly utilized as a best practice approach to assess building performance in the bu...
There has been general recognition within the construction industry that there is a discrepancy betw...
Energy use in buildings accounts for one-third of the overall global energy consumption and total bu...
Research on performance gap suggests that the actual energy consumption in buildings can be twice a...
The non-domestic building sector has in recent years witnessed a boom in the number of ostensibly ‘g...
Using portfolio analysis and individual detailed case studies, we studied the energy performance and...
From SAGE Publishing via Jisc Publications RouterHistory: rev-recd 2021-02-16, received 2021-02-16, ...
Energy performance modelling can provide insights into the efficiency and sustainability of commerci...
Designers develop high-performance office building designs with efficient envelopes, and Heating, Ve...
Operational energy consumption in buildings has a crucial impact on global energy consumption. Never...
The extensively refurbished heritage government department office building in Canberra's Parliamenta...
With the increasing demand for more energy efficient buildings, the construction industry is faced w...
With the increasing demand for more energy efficient buildings, the construction industry is faced w...
There is significant evidence to suggest that buildings do not perform as well as expected, and this...
Measurements of completed projects confirm significant gaps between the predicted and actual energy ...
Simulation is commonly utilized as a best practice approach to assess building performance in the bu...
There has been general recognition within the construction industry that there is a discrepancy betw...
Energy use in buildings accounts for one-third of the overall global energy consumption and total bu...
Research on performance gap suggests that the actual energy consumption in buildings can be twice a...
The non-domestic building sector has in recent years witnessed a boom in the number of ostensibly ‘g...
Using portfolio analysis and individual detailed case studies, we studied the energy performance and...
From SAGE Publishing via Jisc Publications RouterHistory: rev-recd 2021-02-16, received 2021-02-16, ...
Energy performance modelling can provide insights into the efficiency and sustainability of commerci...
Designers develop high-performance office building designs with efficient envelopes, and Heating, Ve...
Operational energy consumption in buildings has a crucial impact on global energy consumption. Never...
The extensively refurbished heritage government department office building in Canberra's Parliamenta...