In 1977, TI purchased a 158,000 SF, single story building which was designed and built prior to the 1973 energy crises and, hence, has no built in energy conservation. This paper addresses the principal retrofit measures taken at this calculator & home computer assembly plant. They are: 1. A roof spray system; 2. Reduction of illumination levels and the use of more efficient luminaries; 3. Chilled water temperatures in the 52 F to 55 F range with condenser water temperatures near the cooling tower designed approach; 4. Installation of a programmed controller with signals sent over existing power lines to control times on and off of exhaust fans, lighting, DX A/C units, etc.; 5. Substitution of energy efficient electrical motors for the or...
With the advent of the Digital Switching Equipment, came the need for year round cooling due to its ...
An Energy Analysis and Diagnostic Center was established at Texas A&M University-Kingsville (formerl...
This paper will describe the existing conditions, strategic planning, feasibility study, economic an...
In 1977, TI purchased a 158,000 SF, single story building which was designed and built prior to the ...
Cooling towers, in all too many industrial plants, are often the neglected units of the process chai...
This paper examines the 5.2 million gallon chilled water storage system installed at TI's Expressway...
Temple-Eastex, at Evadale, Texas, operates a 1600 ton per day bleached kraft pulp and paperboard mil...
Energy consumption and costs to operate an automotive technical training facility at Texas State Tec...
The conservation of energy in industrial operations is essential to meet national goals. In the shor...
Teledyne Continental Motors, Industrial Products Division (IPD), presently has 752,300 square feet o...
The MCA reports chemical industry energy compared to 1972 to be 24.2% (1981 data). This paper will d...
Industrial cooling remains one of the largest potential areas for electrical energy savings in indus...
This case study paper describes energy efficiency improvements to a large sanitary paper products ma...
There are many opportunities to conserve energy within an Industrial Plant without adversely impacti...
The US DOE initiated this project to evaluate the performance of an air conditioner retrofit program...
With the advent of the Digital Switching Equipment, came the need for year round cooling due to its ...
An Energy Analysis and Diagnostic Center was established at Texas A&M University-Kingsville (formerl...
This paper will describe the existing conditions, strategic planning, feasibility study, economic an...
In 1977, TI purchased a 158,000 SF, single story building which was designed and built prior to the ...
Cooling towers, in all too many industrial plants, are often the neglected units of the process chai...
This paper examines the 5.2 million gallon chilled water storage system installed at TI's Expressway...
Temple-Eastex, at Evadale, Texas, operates a 1600 ton per day bleached kraft pulp and paperboard mil...
Energy consumption and costs to operate an automotive technical training facility at Texas State Tec...
The conservation of energy in industrial operations is essential to meet national goals. In the shor...
Teledyne Continental Motors, Industrial Products Division (IPD), presently has 752,300 square feet o...
The MCA reports chemical industry energy compared to 1972 to be 24.2% (1981 data). This paper will d...
Industrial cooling remains one of the largest potential areas for electrical energy savings in indus...
This case study paper describes energy efficiency improvements to a large sanitary paper products ma...
There are many opportunities to conserve energy within an Industrial Plant without adversely impacti...
The US DOE initiated this project to evaluate the performance of an air conditioner retrofit program...
With the advent of the Digital Switching Equipment, came the need for year round cooling due to its ...
An Energy Analysis and Diagnostic Center was established at Texas A&M University-Kingsville (formerl...
This paper will describe the existing conditions, strategic planning, feasibility study, economic an...