In 1979, IBM commissioned its first large scale thermal storage system with a capacity of 2.7 million gallons of chilled water and 1.2 million gallons of reclaimed, low temperature hot water. The stored cooling energy represents approximately 27,000 ton hours. Through reduced chiller plant capacity and annual operating cost savings in primarily electric demand charges the payback will be approximately 3 1/2 years. The water is stored in multiple, insulated tanks, located above the ground. A similar but smaller system at IBM's Charlotte, North Carolina plant has no provisions for heat reclaim. Instead, it uses cooling tower water directly in the chilled water circuit when outside conditions permit. This paper presents system designs, control...
A thermal storage system was installed in a 37,000 ft2 hospital in April 1992. The chiller had to be...
peer reviewedWhile ice storage systems are designed according to a defined strategy for warm day loa...
Growth in peak demand and declining load factors coupled with the high cost of new generating capaci...
This paper illustrates a project implemented in a major IBM plant in Canada using a TES system integ...
In efforts to reduce operating costs, the IBM site at Kingston, New York incorporated the energy sav...
This paper examines the 5.2 million gallon chilled water storage system installed at TI's Expressway...
In 2008 IBM reintroduced water cooling technology into its high performance computing platform, the ...
To reduce the on-peak electrical power consumption, storage devices are widely performed with the he...
Utilities have promoted the use of electric heat and thermal storage to increase off peak usage of p...
Solar powered air-conditioning requires some form of thermal energy storage in order to continuously...
Roger Williams University is a predominantly undergraduate university located in Bristol, RI. Three ...
To achieve greater economic stability, CHP plant operators such as VEAB from Växjö are motivated to ...
The advantages of thermal storage are enhanced in hot and humid climates. Year-round cooling loads i...
Growth in peak demand and declining load factors coupled with the high cost of new generating capaci...
With the ever-increasing cost of electricity and the high demand charges levied by utility companie...
A thermal storage system was installed in a 37,000 ft2 hospital in April 1992. The chiller had to be...
peer reviewedWhile ice storage systems are designed according to a defined strategy for warm day loa...
Growth in peak demand and declining load factors coupled with the high cost of new generating capaci...
This paper illustrates a project implemented in a major IBM plant in Canada using a TES system integ...
In efforts to reduce operating costs, the IBM site at Kingston, New York incorporated the energy sav...
This paper examines the 5.2 million gallon chilled water storage system installed at TI's Expressway...
In 2008 IBM reintroduced water cooling technology into its high performance computing platform, the ...
To reduce the on-peak electrical power consumption, storage devices are widely performed with the he...
Utilities have promoted the use of electric heat and thermal storage to increase off peak usage of p...
Solar powered air-conditioning requires some form of thermal energy storage in order to continuously...
Roger Williams University is a predominantly undergraduate university located in Bristol, RI. Three ...
To achieve greater economic stability, CHP plant operators such as VEAB from Växjö are motivated to ...
The advantages of thermal storage are enhanced in hot and humid climates. Year-round cooling loads i...
Growth in peak demand and declining load factors coupled with the high cost of new generating capaci...
With the ever-increasing cost of electricity and the high demand charges levied by utility companie...
A thermal storage system was installed in a 37,000 ft2 hospital in April 1992. The chiller had to be...
peer reviewedWhile ice storage systems are designed according to a defined strategy for warm day loa...
Growth in peak demand and declining load factors coupled with the high cost of new generating capaci...