Simulation programs are widely used in the design of heating and cooling devices. However, modeling of the whole building with simulation programs is exceptional at least in Finland. We have built and utilized whole building models in a commissioning project to estimate the energy consumption and the indoor climate in an educational building. We have also used component models in the commissioning of a ventilation system. One of our pilots was modeled very accurately using IDA-ICE. Finnish engineering office Granlund LTD has modeled the same building with a simulation program called RIUSKA, which is based on DOE-2. We present an analysis based on verification results of simulation to measured energy consumption, and the results of component...
ABSTRACT This paper attempts to describe the advantages and disadvantages of different modelling app...
Office buildings are very often equipped with complex HVAC systems made of primary, se...
The long-term study of buildings with advance energy solutions has resulted in the need of continuou...
Simulation programs are widely used in the design of heating and cooling devices. However, modeling ...
Results of comparative study for five typical simulation programs (HASP/ACSS, EnergyPlus, DOE-2, Des...
In recent years, operational prediction and optimisation of heating, ventilating and air conditioni...
In practice, building operation systems are only adjusted during commissioning. This is done manuall...
The International Energy Agency ECBCS Annex 40 “Commissioning of Buildings and HVAC Systems for Impr...
Control parameters for HVAC systems are usually set during the Initial Commissioning Process within ...
The today - availability of powerful engineering equation solvers is opening very new possibilities ...
The purpose of this study is to build a dynamic air-conditioning system simulation considered with a...
peer reviewedValidation of simulation models appears from a long time as a key issue in order to pr...
The shortage of natural resources calls for energy conservation and the changing structure of modern...
Environmental, epidemiological and economical reasons increase the pressure to design, construct and...
The aim to more sustainable and efficient buildings has resulted in need of accurate building energy...
ABSTRACT This paper attempts to describe the advantages and disadvantages of different modelling app...
Office buildings are very often equipped with complex HVAC systems made of primary, se...
The long-term study of buildings with advance energy solutions has resulted in the need of continuou...
Simulation programs are widely used in the design of heating and cooling devices. However, modeling ...
Results of comparative study for five typical simulation programs (HASP/ACSS, EnergyPlus, DOE-2, Des...
In recent years, operational prediction and optimisation of heating, ventilating and air conditioni...
In practice, building operation systems are only adjusted during commissioning. This is done manuall...
The International Energy Agency ECBCS Annex 40 “Commissioning of Buildings and HVAC Systems for Impr...
Control parameters for HVAC systems are usually set during the Initial Commissioning Process within ...
The today - availability of powerful engineering equation solvers is opening very new possibilities ...
The purpose of this study is to build a dynamic air-conditioning system simulation considered with a...
peer reviewedValidation of simulation models appears from a long time as a key issue in order to pr...
The shortage of natural resources calls for energy conservation and the changing structure of modern...
Environmental, epidemiological and economical reasons increase the pressure to design, construct and...
The aim to more sustainable and efficient buildings has resulted in need of accurate building energy...
ABSTRACT This paper attempts to describe the advantages and disadvantages of different modelling app...
Office buildings are very often equipped with complex HVAC systems made of primary, se...
The long-term study of buildings with advance energy solutions has resulted in the need of continuou...