abstract: The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning
Sustainable Built Environments Senior Capstone ProjectIn a society growing towards alternative modes...
abstract: Study in preparation for updating the Yuma County 2010 Comprehensive Plan, analyzing: comm...
Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 1981.MI...
abstract: The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, sett...
South Tucson, Arizona faces a slew of challenges, poor public perception, and logistical issues havi...
The Grande Avenue Transportation Design Study is an initial corridor plan for the neighborhoods of B...
abstract: In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a...
Sustainable Built Environments Senior Capstone ProjectThis study will focus on the implementation of...
abstract: An analysis and review of the issues surrounding the city of Chandler's past and current p...
abstract: The Central Avenue Corridor Workshop is a key step in the planning process for economic de...
Sustainable Built Environments Senior Capstone ProjectThis study investigates the outcomes of the In...
abstract: In the spring of 2016, The City of Apache Junction partnered with the School of Geographic...
City of King’s South First Street Corridor Master Plan is a draft document prepared by Cal Poly’s Co...
The City of South Bend has launched the Smart Streets initiative to improve the role of streets thro...
abstract: In the spring of 2016, The City of Apache Junction partnered with the School of Geographic...
Sustainable Built Environments Senior Capstone ProjectIn a society growing towards alternative modes...
abstract: Study in preparation for updating the Yuma County 2010 Comprehensive Plan, analyzing: comm...
Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 1981.MI...
abstract: The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, sett...
South Tucson, Arizona faces a slew of challenges, poor public perception, and logistical issues havi...
The Grande Avenue Transportation Design Study is an initial corridor plan for the neighborhoods of B...
abstract: In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a...
Sustainable Built Environments Senior Capstone ProjectThis study will focus on the implementation of...
abstract: An analysis and review of the issues surrounding the city of Chandler's past and current p...
abstract: The Central Avenue Corridor Workshop is a key step in the planning process for economic de...
Sustainable Built Environments Senior Capstone ProjectThis study investigates the outcomes of the In...
abstract: In the spring of 2016, The City of Apache Junction partnered with the School of Geographic...
City of King’s South First Street Corridor Master Plan is a draft document prepared by Cal Poly’s Co...
The City of South Bend has launched the Smart Streets initiative to improve the role of streets thro...
abstract: In the spring of 2016, The City of Apache Junction partnered with the School of Geographic...
Sustainable Built Environments Senior Capstone ProjectIn a society growing towards alternative modes...
abstract: Study in preparation for updating the Yuma County 2010 Comprehensive Plan, analyzing: comm...
Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 1981.MI...