abstract: Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.Special study (Pima County Regional Flood Control District (Ariz.)) ; 0
abstract: The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Conc...
abstract: This Technical Data notebook has been prepared to study a portion of the Pegler Wash locat...
abstract: This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows...
abstract: The purpose of this study is to provide uniformity in how building permits are processed a...
abstract: This report describes the hydrologic and hydraulic analysis. Development in the lower end ...
tableOfContents: Hydrology Manual - to provide technical procedures for the estimation of flood disc...
abstract: The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of...
abstract: Historically, Pima County has recorded several residential concerns, detailing this area a...
abstract: This study was prepared to provide a drainage condition for Tanuri Wash. Hydrologic and hy...
abstract: This report was prepared to document surface water hydrology and floodplain conditions in ...
abstract: The purpose of the Phase I study is to evaluate existing drainage conditions and to identi...
abstract: This report is the first phase of a study to provide a basin management plan for the Tucso...
abstract: The purpose of this study is to develop a basin management plan for Highlands Wash and the...
abstract: The purpose of this study is to provide flood and erosion hazard information for the Scott...
abstract: The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Co...
abstract: The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Conc...
abstract: This Technical Data notebook has been prepared to study a portion of the Pegler Wash locat...
abstract: This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows...
abstract: The purpose of this study is to provide uniformity in how building permits are processed a...
abstract: This report describes the hydrologic and hydraulic analysis. Development in the lower end ...
tableOfContents: Hydrology Manual - to provide technical procedures for the estimation of flood disc...
abstract: The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of...
abstract: Historically, Pima County has recorded several residential concerns, detailing this area a...
abstract: This study was prepared to provide a drainage condition for Tanuri Wash. Hydrologic and hy...
abstract: This report was prepared to document surface water hydrology and floodplain conditions in ...
abstract: The purpose of the Phase I study is to evaluate existing drainage conditions and to identi...
abstract: This report is the first phase of a study to provide a basin management plan for the Tucso...
abstract: The purpose of this study is to develop a basin management plan for Highlands Wash and the...
abstract: The purpose of this study is to provide flood and erosion hazard information for the Scott...
abstract: The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Co...
abstract: The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Conc...
abstract: This Technical Data notebook has been prepared to study a portion of the Pegler Wash locat...
abstract: This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows...