abstract: This plan has been prepared in recognition of area flooding problems induced by urbanization within this unusually flat portion of the Tucson basin.Special study (Pima County Regional Flood Control District (Ariz.)) ; 02.Executive summary (May 13, 1983).Main report (August 15, 1983)
Completion Report to Pima County Transportation and Flood Control District, September 1984.This item...
abstract: The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of...
abstract: This plan has focused on two program areas: 1) floodplain management through revised flood...
abstract: This report is the first phase of a study to provide a basin management plan for the Tucso...
From the Proceedings of the 1974 Meetings of the Arizona Section - American Water Resources Assn. an...
Proposal submitted to Pima Association of Governments for Consideration in the EPA 208B Study, from ...
abstract: This parcel has some houses already constructed, but most of the area is left undeveloped ...
Research Project Technical Completion Report (B-023-ARIZ) For: United States Department of the Inter...
abstract: The purpose of this study is to revise the existing Flood Insurance Study and Flood Insura...
abstract: Tucson Water's Valley View Reservoir site and Flecha Caida Ranch Estates #9 has experience...
Phase I Draft. Prepared for United States Army Corps of Engineers, Los Angeles District, Tucson Urba...
The Floodplain Management Act of 1973 authorized Arizona counties to adopt rules and regulations con...
abstract: The purpose of the Phase I study is to evaluate existing drainage conditions and to identi...
From the Proceedings of the 1984 Meetings of the Arizona Section - American Water Resources Assn. an...
abstract: Historically, Pima County has recorded several residential concerns, detailing this area a...
Completion Report to Pima County Transportation and Flood Control District, September 1984.This item...
abstract: The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of...
abstract: This plan has focused on two program areas: 1) floodplain management through revised flood...
abstract: This report is the first phase of a study to provide a basin management plan for the Tucso...
From the Proceedings of the 1974 Meetings of the Arizona Section - American Water Resources Assn. an...
Proposal submitted to Pima Association of Governments for Consideration in the EPA 208B Study, from ...
abstract: This parcel has some houses already constructed, but most of the area is left undeveloped ...
Research Project Technical Completion Report (B-023-ARIZ) For: United States Department of the Inter...
abstract: The purpose of this study is to revise the existing Flood Insurance Study and Flood Insura...
abstract: Tucson Water's Valley View Reservoir site and Flecha Caida Ranch Estates #9 has experience...
Phase I Draft. Prepared for United States Army Corps of Engineers, Los Angeles District, Tucson Urba...
The Floodplain Management Act of 1973 authorized Arizona counties to adopt rules and regulations con...
abstract: The purpose of the Phase I study is to evaluate existing drainage conditions and to identi...
From the Proceedings of the 1984 Meetings of the Arizona Section - American Water Resources Assn. an...
abstract: Historically, Pima County has recorded several residential concerns, detailing this area a...
Completion Report to Pima County Transportation and Flood Control District, September 1984.This item...
abstract: The purpose of Phase I of the Riverside Terrace Basin management plan is the assessment of...
abstract: This plan has focused on two program areas: 1) floodplain management through revised flood...