The aim of the bachelor thesis was to make a structural design of steel-load-carrying structure of two-bay production hall with rectangular plan with total width 36m, i.e. with the same width both of the bay 2x18m, and total length ca. 72m. Eaves level of the building is 7,5m. There is one trolley crane with load capacity 5t and span 17,1m in the hall. The building will be roofed by saddle roof with slope 5% (2.86°) and ridge in the middle of the width. Modular distance of main frames is 6m. The production hall is situated on the outskirts of industrial part of town Červený Kostelec. RFEM was used for calculation internal forces on individual structural elements. Designing of elements and joints was made according to valid eurocodes