International audienceHardware Trojan (HT), Integrated Circuit (IC) piracy, and overproduction are three important threats which may happen in untrusted foundries. Modifying structurally the IC design at different abstraction level to counter the HT threats is known as Design-For-Hardware-Trust (DFHT). DFHT methods are used in order to facilitate HT detection methods. In addition, logic masking has been proposed against IC piracy and overproduction. Logic masking modifies the circuit such that it does not work correctly without applying the correct key. In this paper, we propose a DFHT method reusing logic masking approach. The proposed DFHT method modifies the design to improve the HT detection methods that are based on the path delay anal...
2015-02-18High cost differentials are causing many aspects of integrated circuit (IC) design—includi...
Digital Hardware Architecture is widely used in critical applications such as industrial, automotive...
International audienceHardware Trojans have become in the last decade a major threat in the Integrat...
International audienceHardware Trojan (HT), Integrated Circuit (IC) piracy, and overproduction are t...
International audienceHardware Trojan (HT), Integrated Circuit (IC) piracy, and overproduction are t...
Hardware Trojan (HT) and Integrated Circuit (IC)/ Intellectual Property (IP) piracy are important t...
Nowadays, various electronic devices bring convenience to people’s life and work, which is inseparab...
International audience—Hardware Trojans (HT) inserted in integrated circuits have received special a...
Computer systems are woven into the human society, their applications ranging from critical infrastr...
International audienceA Hardware Trojan is a malicious hardware modification of an integrated circui...
Abstract — Fabless semiconductor industry and government agencies have raised serious concerns about...
Hardware Trojans in integrated circuits and systems have become serious concern to fabless semicondu...
The ever-increasing complexity of integrated circuits (ICs) design and manufacturing has necessitate...
Abstract. Hardware Trojans (HTs) are an emerging threat for Inte-grated Circuits (ICs) integrity and...
International audienceHardware Trojans (HTs) are malicious alterations to a circuit. These modificat...
2015-02-18High cost differentials are causing many aspects of integrated circuit (IC) design—includi...
Digital Hardware Architecture is widely used in critical applications such as industrial, automotive...
International audienceHardware Trojans have become in the last decade a major threat in the Integrat...
International audienceHardware Trojan (HT), Integrated Circuit (IC) piracy, and overproduction are t...
International audienceHardware Trojan (HT), Integrated Circuit (IC) piracy, and overproduction are t...
Hardware Trojan (HT) and Integrated Circuit (IC)/ Intellectual Property (IP) piracy are important t...
Nowadays, various electronic devices bring convenience to people’s life and work, which is inseparab...
International audience—Hardware Trojans (HT) inserted in integrated circuits have received special a...
Computer systems are woven into the human society, their applications ranging from critical infrastr...
International audienceA Hardware Trojan is a malicious hardware modification of an integrated circui...
Abstract — Fabless semiconductor industry and government agencies have raised serious concerns about...
Hardware Trojans in integrated circuits and systems have become serious concern to fabless semicondu...
The ever-increasing complexity of integrated circuits (ICs) design and manufacturing has necessitate...
Abstract. Hardware Trojans (HTs) are an emerging threat for Inte-grated Circuits (ICs) integrity and...
International audienceHardware Trojans (HTs) are malicious alterations to a circuit. These modificat...
2015-02-18High cost differentials are causing many aspects of integrated circuit (IC) design—includi...
Digital Hardware Architecture is widely used in critical applications such as industrial, automotive...
International audienceHardware Trojans have become in the last decade a major threat in the Integrat...