International audienceIn practical task scheduling it is sometimes required that the components of a system perform consecutively. Such scheduling is called without no-idle periods. In this paper, we study a particular case of three workshops where the no-idle constraint is applied only on the second stage. A heuristic is proposed and experimented. This work is then extended and tested for a larger size of problems
We consider a problem of scheduling jobs in two-machine no-wait flow shops for which the objective i...
International audienceConstructive heuristics have a great interest as they manage to find in a very...
In this paper hybrid flowshop scheduling problem where some jobs, not all, have to follow no-wait re...
International audienceIn practical task scheduling it is sometimes required that the components of a...
This paper deals with n-job, 2-machine flowshop/mean flowtime scheduling problems working under a "n...
International audienceThe three stage no-idle flow-shop configuration, where machines work continuou...
No-wait flow shop scheduling refers to continuous flow of jobs through different machines. The job o...
In this paper, we deal with a special type of scheduling problem. There are two classes of jobs to b...
Sequencing and scheduling are forms of decision making which play a key role in manufacturing. This ...
In this paper we study the time complexities of some two- and three-stage no-wait flowshop makespan ...
Sequencing and scheduling are forms of decision making which play a key role in manufacturing. This ...
In this paper, we address the problem of scheduling jobs in a no-wait flowshop with the objective of...
Flow shop scheduling is a type of scheduling where sequence follows for each job on a set of machine...
Abstract — No wait flow shop scheduling one of the most significant issues in the planning and opera...
It is well known that the minimal length non-preemptive scheduling problem for the general three-sta...
We consider a problem of scheduling jobs in two-machine no-wait flow shops for which the objective i...
International audienceConstructive heuristics have a great interest as they manage to find in a very...
In this paper hybrid flowshop scheduling problem where some jobs, not all, have to follow no-wait re...
International audienceIn practical task scheduling it is sometimes required that the components of a...
This paper deals with n-job, 2-machine flowshop/mean flowtime scheduling problems working under a "n...
International audienceThe three stage no-idle flow-shop configuration, where machines work continuou...
No-wait flow shop scheduling refers to continuous flow of jobs through different machines. The job o...
In this paper, we deal with a special type of scheduling problem. There are two classes of jobs to b...
Sequencing and scheduling are forms of decision making which play a key role in manufacturing. This ...
In this paper we study the time complexities of some two- and three-stage no-wait flowshop makespan ...
Sequencing and scheduling are forms of decision making which play a key role in manufacturing. This ...
In this paper, we address the problem of scheduling jobs in a no-wait flowshop with the objective of...
Flow shop scheduling is a type of scheduling where sequence follows for each job on a set of machine...
Abstract — No wait flow shop scheduling one of the most significant issues in the planning and opera...
It is well known that the minimal length non-preemptive scheduling problem for the general three-sta...
We consider a problem of scheduling jobs in two-machine no-wait flow shops for which the objective i...
International audienceConstructive heuristics have a great interest as they manage to find in a very...
In this paper hybrid flowshop scheduling problem where some jobs, not all, have to follow no-wait re...