The runway is the main element that combines airside and groundside of the ATM System. Thus, it is crucial to develop efficient models and planning algorithms for its effective usage. The best planning algorithm, however, is useless if the resulting plans cannot be implemented in the real world. This often happens because the input data of the planning algorithms face disturbances or changes over time, respectively. For example, an estimated time of arrival/departure of an aircraft may be changed. It is usually not certain for the next ten hours. In this work, we study the runway scheduling problem under uncertain conditions. First, we present mathematical optimization models that ignore uncertainties. In the most effective approach,...
Abstract—In airports and surrounding terminal airspaces, the integration of arrival, departure and s...
Aircraft Landing Planning is challenging because the inherently limited capacity of airport runways ...
Arrival Manager (AMAN) operational horizon, in Europe, is foreseen to be extended up to 500 nautical...
The runway system is the main element that combines airside and groundside of the ATM System. Effic...
Efficient planning of runway utilization is one of the main challenges in Air Traffic Management (AT...
Efficient planning of runway utilization is one of the main challenges in Air Traffic Management (AT...
International audienceAir traffic management relies strongly on the accuracy of prediction, while un...
In this work, we study the runway scheduling problem from a mathematical modeling and optimization ...
Efficient planning of runway utilisation is one of the main challenges in Air Traffic Management (A...
A key challenge in Air Traffic Management (ATM) is to provide a schedule with high throughput on the...
Abstract-An algorithm for generating schedules of airport runway operations that are robust to pertu...
This thesis describes a solution to the Ground Movement Problem, formulated by Atkin et al. in 2010....
Thesis: Ph. D., Massachusetts Institute of Technology, Department of Aeronautics and Astronautics, 2...
Building robust airline scheduling models involves constructing schedules and routes with reduced le...
Congestion and uncertainty on the airport surface are major constraints to the available capacity of...
Abstract—In airports and surrounding terminal airspaces, the integration of arrival, departure and s...
Aircraft Landing Planning is challenging because the inherently limited capacity of airport runways ...
Arrival Manager (AMAN) operational horizon, in Europe, is foreseen to be extended up to 500 nautical...
The runway system is the main element that combines airside and groundside of the ATM System. Effic...
Efficient planning of runway utilization is one of the main challenges in Air Traffic Management (AT...
Efficient planning of runway utilization is one of the main challenges in Air Traffic Management (AT...
International audienceAir traffic management relies strongly on the accuracy of prediction, while un...
In this work, we study the runway scheduling problem from a mathematical modeling and optimization ...
Efficient planning of runway utilisation is one of the main challenges in Air Traffic Management (A...
A key challenge in Air Traffic Management (ATM) is to provide a schedule with high throughput on the...
Abstract-An algorithm for generating schedules of airport runway operations that are robust to pertu...
This thesis describes a solution to the Ground Movement Problem, formulated by Atkin et al. in 2010....
Thesis: Ph. D., Massachusetts Institute of Technology, Department of Aeronautics and Astronautics, 2...
Building robust airline scheduling models involves constructing schedules and routes with reduced le...
Congestion and uncertainty on the airport surface are major constraints to the available capacity of...
Abstract—In airports and surrounding terminal airspaces, the integration of arrival, departure and s...
Aircraft Landing Planning is challenging because the inherently limited capacity of airport runways ...
Arrival Manager (AMAN) operational horizon, in Europe, is foreseen to be extended up to 500 nautical...