In December 2014, the ESA Council at Ministerial level has decided to go ahead with the Ariane 6 and Vega-C development programmes. The overarching aim of Ariane 6 is to provide guaranteed access to space for Europe at a competitive price. ESA has the role of Procuring entity and Launch System Architect (LSA). As Launch System Architect, ESA ensures the coherence on the Launcher System and the Launch base in the elaboration of the operational concept. The ambitious High Level Requirements of Ariane 6 Project lead to design the Launch System for efficient operations. In this frame, operations are taken “end-to-end”: • From manufacturing until end of Launch Service, • All over the lifecycle of the Launch System, • Encompassing the La...
In preparing for the future, the European Space Agency (ESA) has identified a growing shortage of fl...
As part of Ariane 6 development activities, compliance with Space Debris Requirements is being demon...
Japan and Europe are now getting ready for the maiden flight of their new workhorse launch vehicles:...
After the French minister in charge of space matters declared to be open to discuss about Ariane 6 d...
Space transportation is entering into a strong development and evolution phase. Commercial business ...
A think tank of DLR space-research institutes and ArianeGroup reflected on the launcher perspectives...
This report assembles the key technical data (status autumn 2016) of the Ariane 6, Vega C and the Ar...
Europe is currently defining its near- and long-term launcher strategy. Part of this process involve...
The operational services of the two new members of the European launcher family – Soyuz and Vega – w...
The work performed in 2013 by the X-TRAS (Expertise Raumtransportsysteme) group of DLR on the critic...
DLR-SART has performed, during the summer 2014, a critical analysis of several launcher configuratio...
When the ARIANE Programme was decided, it took knowledge of the EUROPA launch Vehicle development ex...
Developing space launch vehicles (SLVs) is a complex and multidisciplinary task and hence their earl...
The realization of reusability for launch vehicles is expected to lower launch costs, subsequently e...
Europe is currently defining its near- and long-term launcher strategy. Part of this process involve...
In preparing for the future, the European Space Agency (ESA) has identified a growing shortage of fl...
As part of Ariane 6 development activities, compliance with Space Debris Requirements is being demon...
Japan and Europe are now getting ready for the maiden flight of their new workhorse launch vehicles:...
After the French minister in charge of space matters declared to be open to discuss about Ariane 6 d...
Space transportation is entering into a strong development and evolution phase. Commercial business ...
A think tank of DLR space-research institutes and ArianeGroup reflected on the launcher perspectives...
This report assembles the key technical data (status autumn 2016) of the Ariane 6, Vega C and the Ar...
Europe is currently defining its near- and long-term launcher strategy. Part of this process involve...
The operational services of the two new members of the European launcher family – Soyuz and Vega – w...
The work performed in 2013 by the X-TRAS (Expertise Raumtransportsysteme) group of DLR on the critic...
DLR-SART has performed, during the summer 2014, a critical analysis of several launcher configuratio...
When the ARIANE Programme was decided, it took knowledge of the EUROPA launch Vehicle development ex...
Developing space launch vehicles (SLVs) is a complex and multidisciplinary task and hence their earl...
The realization of reusability for launch vehicles is expected to lower launch costs, subsequently e...
Europe is currently defining its near- and long-term launcher strategy. Part of this process involve...
In preparing for the future, the European Space Agency (ESA) has identified a growing shortage of fl...
As part of Ariane 6 development activities, compliance with Space Debris Requirements is being demon...
Japan and Europe are now getting ready for the maiden flight of their new workhorse launch vehicles:...