"Construction of two 69 kV (kilovolt) transmission lines from the proposed geothermal electric power plant at Pohoiki to the vicinity of the Puna Substation in Keaau, Hawaii. It is estimated that the length of each transmission line would be 16 to 18 miles. The transmission lines would be constructed in two phases; the first by late 1989 and the second line to be completed by 1993. An Environmental Impact Statement for a two-unit 25 MW (megawatt) geothermal electric power plant, which is the source of power to be transmitted, is being prepared separately by the Puna Geothermal Venture.
This environmental impact statement describes the proposed development of the wellhead generator pro...
Tax map key: no. 1-1-01, Parcel 1 and no. 1-2-08, Parcel 1"This environmental document is submitted ...
Discussion of projected impacts from the development of 500 MWe of geothermal power in Hawaii.Prepar...
"Construction of two 69 kV (kilovolt) transmission lines from the proposed geothermal electric power...
The U.S. Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identi...
"This environmental impact assessment addresses the design, construction, and operation of an electr...
This environmental impact assessment addresses the design, construction, and operation of an electri...
Supplements: Revised environmental impact statement for the Kahaualeʻa geothermal project, District ...
Prepared for the Energy Division Department of Business and Economic Development by MCM Planning 703...
Sections: PGV 25MW Project, Project Description, Geothermal Power in Hawaii, Location and Descriptio...
"As a continuation of the exploratory drilling project, it is now proposed to install a wellhead gen...
The State of Hawaii anticipates that by the year 2007 up to 500 deliverable megawatts (MW or MWe) of...
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been p...
information on public forum regarding Hawaii's geothermal project and background informatio
In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of ...
This environmental impact statement describes the proposed development of the wellhead generator pro...
Tax map key: no. 1-1-01, Parcel 1 and no. 1-2-08, Parcel 1"This environmental document is submitted ...
Discussion of projected impacts from the development of 500 MWe of geothermal power in Hawaii.Prepar...
"Construction of two 69 kV (kilovolt) transmission lines from the proposed geothermal electric power...
The U.S. Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identi...
"This environmental impact assessment addresses the design, construction, and operation of an electr...
This environmental impact assessment addresses the design, construction, and operation of an electri...
Supplements: Revised environmental impact statement for the Kahaualeʻa geothermal project, District ...
Prepared for the Energy Division Department of Business and Economic Development by MCM Planning 703...
Sections: PGV 25MW Project, Project Description, Geothermal Power in Hawaii, Location and Descriptio...
"As a continuation of the exploratory drilling project, it is now proposed to install a wellhead gen...
The State of Hawaii anticipates that by the year 2007 up to 500 deliverable megawatts (MW or MWe) of...
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been p...
information on public forum regarding Hawaii's geothermal project and background informatio
In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of ...
This environmental impact statement describes the proposed development of the wellhead generator pro...
Tax map key: no. 1-1-01, Parcel 1 and no. 1-2-08, Parcel 1"This environmental document is submitted ...
Discussion of projected impacts from the development of 500 MWe of geothermal power in Hawaii.Prepar...