The last major performance breakthroughs in job shop control stem from the 1980s and 1990s. We generate a new search direction for designing job shop control policies, providing a key to delivery improvements. Based on a common characteristic shared by the most effective job shop control policies, we posit that control should have a specific focus during high load periods. A probability analysis reveals that substantial periods of high load are common, and even occur under assumptions of stationarity and moderate utilization. Subsequent simulations show nearly all tardy deliveries can be attributed to high load periods; and that the success of the best control policies can be explained by their ability to switch focus specifically during th...