ETCS Level 3 – today the highest level of ETCS – relies on train-side detection of trainintegrity. This paper elaborates on newly designed alternatives for detection of train-integrity. The fundamental safety targets of German train protection systems served as a basis for the presented alternatives. We compare these alternatives to the effects on capacity at lines and different kinds of stations. Furthermore we show the positive effect to control of shunting traction vehicles and the use as a fall-back level are shown
Abstract: The introduction of the new ÖBB management operation system has to result in an increase i...
The European Train Control System (ETCS) is currently taken into operation on more and more lines in...
European Conference on Safety and Reliability (ESREL2022), Dublin, IRELANDE, 28-/08/2022 - 01/09/202...
ETCS Level 3 – today the highest level of ETCS – relies on train-side detection of trainintegrity. T...
Block signalling and Automatic Train Protection are two of the main railway safety systems to contro...
This paper focuses on selected problem areas in the implementation of ETCS L3, analyz-es their impac...
Informal description In this case study we consider the treatment of emergency messages as required ...
Most railways use fixed block technology, which could be replaced with moving block technology with ...
The increasing demand for transport and the shift from road to rail cause the congestion in railway ...
This contribution describes the results of investigations and evaluations carried out on new systems...
In the field of railway operation, it is essential to establish uniform conditions for interconnecti...
Development of technology management and security, transmission and information systems allows the c...
The consolidation of the European Train Control System (ETCS) of the European Railway Traffic Manage...
The realization of the interoperability between the partners of an intermodal transportation chain a...
It is necessary to verify the faults tolerance of the European Train Control System (ETCS) on-board ...
Abstract: The introduction of the new ÖBB management operation system has to result in an increase i...
The European Train Control System (ETCS) is currently taken into operation on more and more lines in...
European Conference on Safety and Reliability (ESREL2022), Dublin, IRELANDE, 28-/08/2022 - 01/09/202...
ETCS Level 3 – today the highest level of ETCS – relies on train-side detection of trainintegrity. T...
Block signalling and Automatic Train Protection are two of the main railway safety systems to contro...
This paper focuses on selected problem areas in the implementation of ETCS L3, analyz-es their impac...
Informal description In this case study we consider the treatment of emergency messages as required ...
Most railways use fixed block technology, which could be replaced with moving block technology with ...
The increasing demand for transport and the shift from road to rail cause the congestion in railway ...
This contribution describes the results of investigations and evaluations carried out on new systems...
In the field of railway operation, it is essential to establish uniform conditions for interconnecti...
Development of technology management and security, transmission and information systems allows the c...
The consolidation of the European Train Control System (ETCS) of the European Railway Traffic Manage...
The realization of the interoperability between the partners of an intermodal transportation chain a...
It is necessary to verify the faults tolerance of the European Train Control System (ETCS) on-board ...
Abstract: The introduction of the new ÖBB management operation system has to result in an increase i...
The European Train Control System (ETCS) is currently taken into operation on more and more lines in...
European Conference on Safety and Reliability (ESREL2022), Dublin, IRELANDE, 28-/08/2022 - 01/09/202...