The current empirical methods for determining traffic-opening criteria can be overly conservative causing unnecessary construction delays and user costs. The research described here recommends innovative mechanistic based procedures for monitoring concrete early age development and evaluating the effect of early traffic opening on long-term damage accumulation. The procedure utilizes recent developments in nondestructive testing to optimize traffic opening timing without jeopardizing pavement longevity. These tasks were achieved via extensive field and laboratory experiments allowing for the analysis of variables such as curing condition and loading type with respect to the effect of early loading of concrete. The results of these efforts c...
Fast track concrete technology has been used over the past two decades for overnight highway repairs...
The project “Simplified Design Table for Minnesota Concrete Pavements” led to the creation of MnPCC-...
textConcrete pavements are subjected to many traffic-load repetitions prior to achievement of their...
Determining the opening time for a concrete pavement is a critical decision. Longer construction tim...
The main objective of this experimental and analytical research project was to develop maturity-base...
Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of c...
The risk of cracking in a concrete pavement that is opened to traffic at early ages is related to th...
This report presents the results of a detailed stress analysis and a field and laboratory test progr...
2016PDFTech Report16-2C1000102Best practicesConcrete pavementsDurabilityFlexural strengthRoad constr...
PDFTech Reporthttp://dx.doi.org/10.5703/1288284316003FHWA/IN/JTRP/2016/18SPR-3403Concrete pavementsA...
Data collection to determine the rate of bond strength development between concrete overlays and exi...
Illinois Department of Transportation (IDOT) follow Illinois modified AASHTO T23 test method for mak...
Time and curing conditions may impact the strength and permeability of concrete. The strength and pe...
The objective of this study was to monitor and evaluate the performance of experimental full-depth r...
The Minnesota Road Research (MnROAD) facility was constructed in the early 1990’s to include fourtee...
Fast track concrete technology has been used over the past two decades for overnight highway repairs...
The project “Simplified Design Table for Minnesota Concrete Pavements” led to the creation of MnPCC-...
textConcrete pavements are subjected to many traffic-load repetitions prior to achievement of their...
Determining the opening time for a concrete pavement is a critical decision. Longer construction tim...
The main objective of this experimental and analytical research project was to develop maturity-base...
Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of c...
The risk of cracking in a concrete pavement that is opened to traffic at early ages is related to th...
This report presents the results of a detailed stress analysis and a field and laboratory test progr...
2016PDFTech Report16-2C1000102Best practicesConcrete pavementsDurabilityFlexural strengthRoad constr...
PDFTech Reporthttp://dx.doi.org/10.5703/1288284316003FHWA/IN/JTRP/2016/18SPR-3403Concrete pavementsA...
Data collection to determine the rate of bond strength development between concrete overlays and exi...
Illinois Department of Transportation (IDOT) follow Illinois modified AASHTO T23 test method for mak...
Time and curing conditions may impact the strength and permeability of concrete. The strength and pe...
The objective of this study was to monitor and evaluate the performance of experimental full-depth r...
The Minnesota Road Research (MnROAD) facility was constructed in the early 1990’s to include fourtee...
Fast track concrete technology has been used over the past two decades for overnight highway repairs...
The project “Simplified Design Table for Minnesota Concrete Pavements” led to the creation of MnPCC-...
textConcrete pavements are subjected to many traffic-load repetitions prior to achievement of their...