Minnesota has over 2,000 bridges that contain structural timber in the superstructure or the substructure. Historically, inspections for timber bridges have been mostly limited to visual inspection, hammer sounding and probing. These techniques have proven appropriate for advanced decay detection, but are inadequate for early stage or internal deterioration. During this project, new advanced inspection techniques and equipment were identified that were capable of improving the quality of timber bridge inspection. This equipment and technologies were introduced into routine bridge inspections through the development of standard inspection protocols, integration of the results into bridge data management software, development of a customized ...
With bridge infrastructure in Minnesota aging, advancing techniques for ensuring bridge safety is a ...
PDFTech ReportResearch Report No. 61Research Project No. 71-2M(B)Louisiana HPR 1(9)Construction safe...
2018Final Report, 11/01/2012 to 10/31/2018PDFTech ReportSPR-1617C2010-0295Asset managementBridge dec...
The primary objective of this work is to provide formal guidance to county engineers throughout Minn...
Approximately 35% of Minnesota's 1,373 bridges are reaching the end of their expected service life. ...
With bridge infrastructure in Minnesota aging, advancing techniques for ensuring bridge safety is a ...
As the needs for transportation systems change, the loading requirements and demands on the transpor...
Timber material repair and replacement cost for timber bridges is a considerable expense to highway ...
This project focused on implementing the 3DOBS technology (developed under Phase I and Phase II) for...
With bridge infrastructure in Minnesota aging, advancing techniques for ensuring the safety of bridg...
Non-Destructive Testing (NDT) methods have been developed and employed as a means of rapid and effec...
This paper summarizes a cooperative project to assess the current condition and life expectancy of 1...
Many modern timber bridges have been built in Sweden during the last ten years. This report is about...
Based on previous National Bridge Inventory data, the state of Iowa has nearly 20,000 bridges on low...
With such a large number of bridges requiring attention and available funds decreasing while mainten...
With bridge infrastructure in Minnesota aging, advancing techniques for ensuring bridge safety is a ...
PDFTech ReportResearch Report No. 61Research Project No. 71-2M(B)Louisiana HPR 1(9)Construction safe...
2018Final Report, 11/01/2012 to 10/31/2018PDFTech ReportSPR-1617C2010-0295Asset managementBridge dec...
The primary objective of this work is to provide formal guidance to county engineers throughout Minn...
Approximately 35% of Minnesota's 1,373 bridges are reaching the end of their expected service life. ...
With bridge infrastructure in Minnesota aging, advancing techniques for ensuring bridge safety is a ...
As the needs for transportation systems change, the loading requirements and demands on the transpor...
Timber material repair and replacement cost for timber bridges is a considerable expense to highway ...
This project focused on implementing the 3DOBS technology (developed under Phase I and Phase II) for...
With bridge infrastructure in Minnesota aging, advancing techniques for ensuring the safety of bridg...
Non-Destructive Testing (NDT) methods have been developed and employed as a means of rapid and effec...
This paper summarizes a cooperative project to assess the current condition and life expectancy of 1...
Many modern timber bridges have been built in Sweden during the last ten years. This report is about...
Based on previous National Bridge Inventory data, the state of Iowa has nearly 20,000 bridges on low...
With such a large number of bridges requiring attention and available funds decreasing while mainten...
With bridge infrastructure in Minnesota aging, advancing techniques for ensuring bridge safety is a ...
PDFTech ReportResearch Report No. 61Research Project No. 71-2M(B)Louisiana HPR 1(9)Construction safe...
2018Final Report, 11/01/2012 to 10/31/2018PDFTech ReportSPR-1617C2010-0295Asset managementBridge dec...