Many failures have occurred in the live and dead end anchors of post-tensioned (PT) suspended slabs during the post-tensioning process, prompting a closer study of the behaviour of anchorage zone concrete. In suspended slabs, the post-tensioning loads are transferred to concrete mass via an anchorage assembly that consists in a strand and anchor component. As a part of wider study to establish the failure mechanism of anchorage zone concrete, pullout tests are carried out to investigate the bond behaviour of the strand and wire in early age concrete. Direct type pullout specimens were tested at 3, 4, 7, 14 and 21 days after pouring the concrete. The aim of the experiments was to evaluate the bond performance of strand and wire in high early...
In pretensioned concrete members, strand bond is necessary for transferring prestress force from the...
Screw anchors are gaining popularity in construction due to simplicity of their installation, abilit...
The studies on the transmission length over which the prestressing force is fully transmitted to th...
The post-tensioning loads in suspended slabs are transferred to concrete mass via an anchorage asse...
One of the innovative structural techniques is post-tensioning members with H-anchorage dead end (on...
Anchorage zones of post-tensioned (PT) concrete slabs experience concentrated stresses as a result o...
A simple method is presented, suitable for the repetitive testing necessary to investigate fully the...
The purpose of this research is to obtain the anchorage length and the bond stress-slip relationship...
Continuous vertical force on sleepers gradually degrades the bonding between the concrete and the pr...
The bond between strands and concrete is of importance for prestressed concrete. The research presen...
A direct method which was useful for repeated quick tests was presented to determine the bond anchor...
Achieving good bond between prestressing strand and concrete is critical to ensure proper performanc...
The periodic assessment of our existing concrete infrastructure is a crucial part of maintaining app...
This paper presents the results of an experimental research program addressing the bond behavior of ...
This study investigates the tensile behavior of anchor pull-out tests from super early age concrete...
In pretensioned concrete members, strand bond is necessary for transferring prestress force from the...
Screw anchors are gaining popularity in construction due to simplicity of their installation, abilit...
The studies on the transmission length over which the prestressing force is fully transmitted to th...
The post-tensioning loads in suspended slabs are transferred to concrete mass via an anchorage asse...
One of the innovative structural techniques is post-tensioning members with H-anchorage dead end (on...
Anchorage zones of post-tensioned (PT) concrete slabs experience concentrated stresses as a result o...
A simple method is presented, suitable for the repetitive testing necessary to investigate fully the...
The purpose of this research is to obtain the anchorage length and the bond stress-slip relationship...
Continuous vertical force on sleepers gradually degrades the bonding between the concrete and the pr...
The bond between strands and concrete is of importance for prestressed concrete. The research presen...
A direct method which was useful for repeated quick tests was presented to determine the bond anchor...
Achieving good bond between prestressing strand and concrete is critical to ensure proper performanc...
The periodic assessment of our existing concrete infrastructure is a crucial part of maintaining app...
This paper presents the results of an experimental research program addressing the bond behavior of ...
This study investigates the tensile behavior of anchor pull-out tests from super early age concrete...
In pretensioned concrete members, strand bond is necessary for transferring prestress force from the...
Screw anchors are gaining popularity in construction due to simplicity of their installation, abilit...
The studies on the transmission length over which the prestressing force is fully transmitted to th...