The goal of the National TRU Waste Program (NTP) is to operate the system safely and cost-effectively, in compliance with applicable regulations and agreements, and at full capacity in a fully integrated mode. One of the objectives of the Department of Energy's Carlsbad Field Office (DOE/CBFO) is to complete the current Waste Isolation Pilot Plant (WIPP) mission for the disposal of the nation's legacy transuranic (TRU) waste at least IO years earlier thus saving approximately %7B. The National TRU Waste Optimization Plan (1) recommends changes to accomplish this. This paper discusses the optimization of the National TRU Waste System Transportation Program
Since the Waste Isolation Pilot Plant (WIPP) opened for receipt of non-mixed contact-handled (CH) tr...
WIPP`s long-standing mission is to demonstrate the safe disposal of TRU waste from US defense activi...
As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation...
On March 26, 1999, the Waste Isolation Pilot Plant (WIPP) received its first shipment of transuranic...
In 1999, the National Transuranic (TRU) Waste Program (NTP) achieved two significant milestones. Fir...
The Waste Isolatian Pilot Plant (WIPP) opened on March 26,1999, for the permanent disposal of defens...
After opening the Waste Isolation Pilot Plant (WIPP) for the permanent disposal of transuranic (TRU)...
In 1999, the National Transuranic (TRU) Waste Program (NTP) achieved two significant milestones. Fir...
The Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) opened on March 26, 1999, becomi...
The mission of the Carlsbad Area Office (CAO) is to support the protection of human health and the e...
The purpose of this study is to provide the DOE information with which it can establish the most eff...
The cost/schedule optimization task is a necessary function to insure that program goals and plans a...
Since March 1999, the Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has be...
The Waste Isolation Pilot Plant (WIPP) is an authorized US Department of Energy (DOE) research and d...
This paper provides information on the volume of TRU waste loads requiring treatment, storage, and d...
Since the Waste Isolation Pilot Plant (WIPP) opened for receipt of non-mixed contact-handled (CH) tr...
WIPP`s long-standing mission is to demonstrate the safe disposal of TRU waste from US defense activi...
As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation...
On March 26, 1999, the Waste Isolation Pilot Plant (WIPP) received its first shipment of transuranic...
In 1999, the National Transuranic (TRU) Waste Program (NTP) achieved two significant milestones. Fir...
The Waste Isolatian Pilot Plant (WIPP) opened on March 26,1999, for the permanent disposal of defens...
After opening the Waste Isolation Pilot Plant (WIPP) for the permanent disposal of transuranic (TRU)...
In 1999, the National Transuranic (TRU) Waste Program (NTP) achieved two significant milestones. Fir...
The Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) opened on March 26, 1999, becomi...
The mission of the Carlsbad Area Office (CAO) is to support the protection of human health and the e...
The purpose of this study is to provide the DOE information with which it can establish the most eff...
The cost/schedule optimization task is a necessary function to insure that program goals and plans a...
Since March 1999, the Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has be...
The Waste Isolation Pilot Plant (WIPP) is an authorized US Department of Energy (DOE) research and d...
This paper provides information on the volume of TRU waste loads requiring treatment, storage, and d...
Since the Waste Isolation Pilot Plant (WIPP) opened for receipt of non-mixed contact-handled (CH) tr...
WIPP`s long-standing mission is to demonstrate the safe disposal of TRU waste from US defense activi...
As a generator of transuranic (TRU) and TRU mixed waste destined for disposal at the Waste Isolation...