Project-X is a proposed project to be built at Fermi National Accelerator Laboratory with several potential missions. A primary part of the Project-X accelerator chain is a Superconducting linac, and In October 2009 a workshop was held to concentrate on the linac parameters. The charge of the workshop was to 'focus only on the SRF linac approaches and how it can be used'. The focus of Working Group 2 of this workshop was to evaluate how the different linac options being considered impact the potential realization of Muon Collider (MC) and Neutrino Factory (NF) applications. In particular the working group charge was, 'to investigate the use of a multi-megawatt proton linac to target, phase rotate and collect muons to support a muon collider...
A significant worldwide R & D effort is presently directed toward solving the technical challen...
There are three types of future neutrino facilities currently under study, one based on decays of st...
Abstract. We present a summary of the main topics discussed in the Accelerator Working Group during ...
This document contains a description of a multi-year national R&D program aimed at completing a ...
It has been shown how a superconducting Linac that was designed to be a high-intensity proton driver...
This document contains a description of a multi-year national R&D program aimed at completing a ...
This note describes how a future Fermilab proton driver [1] based on TESLA superconducting linac mod...
This document contains a description of a multi-year national R&D program aimed at completing a ...
Future Muon Colliders (MC) and Neutrino Factories (NF) based on muon storage rings will require inno...
A significant worldwide R and D effort is presently directed toward solving the technical challenges...
A superconducting proton linac delivering a mean beam power of 4 MW is being considered at CERN as a...
A muon collider would be a powerful tool for exploring the energy-frontier with leptons, and would c...
The potential of muon beams for high energy physics applications is described along with the challen...
A significant worldwide R & D effort is presently directed toward solving the technical challeng...
An accelerator complex that can produce ultra-intense beams of muons presents many opportunities to ...
A significant worldwide R & D effort is presently directed toward solving the technical challen...
There are three types of future neutrino facilities currently under study, one based on decays of st...
Abstract. We present a summary of the main topics discussed in the Accelerator Working Group during ...
This document contains a description of a multi-year national R&D program aimed at completing a ...
It has been shown how a superconducting Linac that was designed to be a high-intensity proton driver...
This document contains a description of a multi-year national R&D program aimed at completing a ...
This note describes how a future Fermilab proton driver [1] based on TESLA superconducting linac mod...
This document contains a description of a multi-year national R&D program aimed at completing a ...
Future Muon Colliders (MC) and Neutrino Factories (NF) based on muon storage rings will require inno...
A significant worldwide R and D effort is presently directed toward solving the technical challenges...
A superconducting proton linac delivering a mean beam power of 4 MW is being considered at CERN as a...
A muon collider would be a powerful tool for exploring the energy-frontier with leptons, and would c...
The potential of muon beams for high energy physics applications is described along with the challen...
A significant worldwide R & D effort is presently directed toward solving the technical challeng...
An accelerator complex that can produce ultra-intense beams of muons presents many opportunities to ...
A significant worldwide R & D effort is presently directed toward solving the technical challen...
There are three types of future neutrino facilities currently under study, one based on decays of st...
Abstract. We present a summary of the main topics discussed in the Accelerator Working Group during ...