The purpose of this report is to document the acceptability of Sludge Batch 5 with the initial macrobatch operation of the Interim Salt Disposition Project (ISDP) waste to the Defense Waste Processing Facility (DWPF). This report was prepared to comply with the requirements listed in the Waste Acceptance Criteria for Sludge, Actinide Removal Process (ARP), and Modular Caustic Side Solvent Extraction Unit (MCU) Process Transfers to 512-S and DWPF. The requirements for transfers to 512-S were evaluated during ISDP Salt Batch 1 qualification. The calculations of sludge concentrations are based entirely on the Tank 51 sample processed at SRNL. This is conservative because Tank 51 is blended with the dilute feed in the DWPF Feed Tank (Tank 40). ...
Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonst...
The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 3 (SB3), Macrobatch 4 (MB...
In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for ...
The Actinide Removal Process (ARP) facility and the Modular Caustic Side Solvent Extraction Unit (MC...
Two facilities for treating the salt currently being stored in the High Level Waste (HLW) tanks are ...
The sludge in tanks 42 and 51 is to be washed with inhibited water to remove soluble salts and combi...
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savanna...
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savanna...
This report contains the results and comparison of data generated from inductively coupled plasma – ...
The Defense Waste Processing Facility (DWPF), at the Savannah River Site (SRS), is currently process...
Defense Waste Processing Facility (DWPF) requested the development of a sludge-only process for Tank...
The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 4 (SB4), Macrobatch 5 (MB...
The Waste Acceptance Product Specifications (WAPS) 1.2 require that ''The Producer shall report the ...
The current Waste Solidification Engineering (WSE) practice is to prepare sludge batches in Tank 51 ...
The DWPF at the Department of Energy`s (DOE) Savannah River Site (SRS) began radioactive operations ...
Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonst...
The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 3 (SB3), Macrobatch 4 (MB...
In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for ...
The Actinide Removal Process (ARP) facility and the Modular Caustic Side Solvent Extraction Unit (MC...
Two facilities for treating the salt currently being stored in the High Level Waste (HLW) tanks are ...
The sludge in tanks 42 and 51 is to be washed with inhibited water to remove soluble salts and combi...
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savanna...
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savanna...
This report contains the results and comparison of data generated from inductively coupled plasma – ...
The Defense Waste Processing Facility (DWPF), at the Savannah River Site (SRS), is currently process...
Defense Waste Processing Facility (DWPF) requested the development of a sludge-only process for Tank...
The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 4 (SB4), Macrobatch 5 (MB...
The Waste Acceptance Product Specifications (WAPS) 1.2 require that ''The Producer shall report the ...
The current Waste Solidification Engineering (WSE) practice is to prepare sludge batches in Tank 51 ...
The DWPF at the Department of Energy`s (DOE) Savannah River Site (SRS) began radioactive operations ...
Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonst...
The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 3 (SB3), Macrobatch 4 (MB...
In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for ...