This report provides documentation of the initial startup and testing of the first electrolysis module in the Idaho National Laboratory (INL) High Temperature Steam Electrolysis Integrated Laboratory Scale (ILS) facility. Initial shakedown testing of the INL ILS experimental facility commenced on August 22, 2007. This fulfilled a DOE Level 2 milestone. Heatup of the first ILS module started at approximately 4:10 PM on September 24, 2007. Initial module testing continued for 420 hours. The test average H2 production rate was approximately 1.3 Nm3/hr (0.116 kg H2/hr), with a peak measured value of over 2 Nm3/hr (0.179 kg H2/hr). Significant module performance degradation was observed over the first 250 hours, after which no further degradatio...