This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2005. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR)
The Waste Isolation Pilot Plant (WIPP), a facility located in a bedded salt formation in Carlsbad, N...
The present report lists the technical reviews and comments made during the fiscal year 1988 and sum...
This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreh...
This report is a compilation of geotechnical data presented as plots for each active instrument inst...
This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the under...
This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the under...
The geotechnical data from the underground excavations at the WIPP are interpreted and presented in ...
The geotechnical data from the underground excavations at the WIPP are interpreted and presented in ...
This plan presents background information and a working guide to assist Mine Operations and Engineer...
The specific objectives of the work were defined by the Environmental Evaluation Group (EEG) as foll...
The Waste Isolation Pilot Plant (WIPP) is the first nuclear waste repository certified by the United...
The Geological Characterization Report (GCR) for the WIPP site presents, in one document, a compilat...
A geotechnical investigation has been completed for the In Tank Processing Facility (ITP) which cons...
A variety of geophysical methods including the spectrum of seismic, electrical, electromagnetic and ...
Reducing the risks associated with tunnel construction is the main purpose of geotechnical investiga...
The Waste Isolation Pilot Plant (WIPP), a facility located in a bedded salt formation in Carlsbad, N...
The present report lists the technical reviews and comments made during the fiscal year 1988 and sum...
This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreh...
This report is a compilation of geotechnical data presented as plots for each active instrument inst...
This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the under...
This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the under...
The geotechnical data from the underground excavations at the WIPP are interpreted and presented in ...
The geotechnical data from the underground excavations at the WIPP are interpreted and presented in ...
This plan presents background information and a working guide to assist Mine Operations and Engineer...
The specific objectives of the work were defined by the Environmental Evaluation Group (EEG) as foll...
The Waste Isolation Pilot Plant (WIPP) is the first nuclear waste repository certified by the United...
The Geological Characterization Report (GCR) for the WIPP site presents, in one document, a compilat...
A geotechnical investigation has been completed for the In Tank Processing Facility (ITP) which cons...
A variety of geophysical methods including the spectrum of seismic, electrical, electromagnetic and ...
Reducing the risks associated with tunnel construction is the main purpose of geotechnical investiga...
The Waste Isolation Pilot Plant (WIPP), a facility located in a bedded salt formation in Carlsbad, N...
The present report lists the technical reviews and comments made during the fiscal year 1988 and sum...
This report contains a condensed listing of Waste Isolation Pilot Plant (WIPP) project surface boreh...