During the period of October 15 and 18, 2007, ORISE performed confirmatory radiological survey activities which included beta and gamma structural surface scans and beta activity direct measurements within the Auxiliary Building, beta or gamma scans within Turbine Building embedded piping, beta activity determinations within Turbine Building Drain 3-1-27, and gamma scans and the collection of a soil sample from the clay soils adjacent to the Lower Mixing Box
This document contains the process knowledge, radiological data and subsequent statistical methodolo...
Conduct verification surveys of grids at the DWI 1630 Site in Knoxville, Tennessee. The independent ...
The US Department of Energy (DOE) conducted remedial action during 1993 at the Pompton Plains Railro...
During the period of October 15 and 18, 2007, ORISE performed confirmatory radiological survey activ...
Results from a confirmatory survey of the upper structural surfaces of the Reactor Building Dome at ...
As part of the Formerly Utilized Sites Remedial Action Program, a team from Oak Ridge National Labor...
Confirm that the final radiological conditions were accurately and adequately described in the FSS d...
As part of the Formerly Utilized Sites Remedial Action Progmq a team from Oak Ridge National Laborat...
At the request of the US Department of Energy (DOE), a team from oak Ridge National Laboratory condu...
Between October 1952 and February 1957, National Lead of Ohio (NLO), a primary contractor for the At...
Issued as Final report, Project no. E-26-625Final report has title: Validity and design of environme...
The former Associate Aircraft Tool and Manufacturing Company site is located at 3550 Dixie Highway, ...
Of the numerous original buildings, only Building P, the Critical Assembly Building, remains standin...
At the request of the USDOE, a team from ORNL conducted an independent radiological verification sur...
Between October 1952 and February 1957, National Lead of Ohio (NLO), a primary contractor for the At...
This document contains the process knowledge, radiological data and subsequent statistical methodolo...
Conduct verification surveys of grids at the DWI 1630 Site in Knoxville, Tennessee. The independent ...
The US Department of Energy (DOE) conducted remedial action during 1993 at the Pompton Plains Railro...
During the period of October 15 and 18, 2007, ORISE performed confirmatory radiological survey activ...
Results from a confirmatory survey of the upper structural surfaces of the Reactor Building Dome at ...
As part of the Formerly Utilized Sites Remedial Action Program, a team from Oak Ridge National Labor...
Confirm that the final radiological conditions were accurately and adequately described in the FSS d...
As part of the Formerly Utilized Sites Remedial Action Progmq a team from Oak Ridge National Laborat...
At the request of the US Department of Energy (DOE), a team from oak Ridge National Laboratory condu...
Between October 1952 and February 1957, National Lead of Ohio (NLO), a primary contractor for the At...
Issued as Final report, Project no. E-26-625Final report has title: Validity and design of environme...
The former Associate Aircraft Tool and Manufacturing Company site is located at 3550 Dixie Highway, ...
Of the numerous original buildings, only Building P, the Critical Assembly Building, remains standin...
At the request of the USDOE, a team from ORNL conducted an independent radiological verification sur...
Between October 1952 and February 1957, National Lead of Ohio (NLO), a primary contractor for the At...
This document contains the process knowledge, radiological data and subsequent statistical methodolo...
Conduct verification surveys of grids at the DWI 1630 Site in Knoxville, Tennessee. The independent ...
The US Department of Energy (DOE) conducted remedial action during 1993 at the Pompton Plains Railro...