In the Third Quarter of 1982, the number of signed contracts and committed projects rose from 148 to 173, with a total estimated nominal capacity of these projects of 922 MW. Of this nominal capacity, about 168 MW is operational, and the balance is under contract for development. Of the 173 signed contracts and committed projects, 61 were cogeneration and solid waste projects with a potential of 643 MW. PG and E also had under active discussion 28 cogeneration projects that could generate a total of 968 MW to 1,049 MW, and 10 solid waste projects with a potential of 90 MW to 95 MW. Wind projects under contract number 84, with a generating capability of 85 MW. Also, discussions are being conducted with 17 wind projects, totaling 83 MW. There...
Document: United States Department of the Interior news release: "Reclamation Tentatively Allocates ...
Pumping Energy and Generation Associated with Proposed Initial Plan Facilities in California--The in...
The estimates of existing, incremental, and the undeveloped hydropower potential for all states in t...
In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to...
In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 t...
At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for co...
At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small ...
At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for c...
The 1979 Biennial Report of the California Energy Commission states that the development of preferre...
Document: "Appraisal Report Central Arizona Project-Chapter IV", January 1962, page 48available for ...
The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities inte...
Congress passed the Public Utility Regulatory Policies Act (PURPA) in November 1978. It was about tw...
Document: The Pacific Southwest Water Plan, A report of the Assembly Interim Committee on Water to t...
The California Energy Commission has been implementing its Public Interest Energy Research (PIER) an...
Document: Pacific Southwest Water Plan "Printed Copy" Chapter V, August 26 ,1963 page 4increase in t...
Document: United States Department of the Interior news release: "Reclamation Tentatively Allocates ...
Pumping Energy and Generation Associated with Proposed Initial Plan Facilities in California--The in...
The estimates of existing, incremental, and the undeveloped hydropower potential for all states in t...
In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to...
In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 t...
At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for co...
At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small ...
At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for c...
The 1979 Biennial Report of the California Energy Commission states that the development of preferre...
Document: "Appraisal Report Central Arizona Project-Chapter IV", January 1962, page 48available for ...
The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities inte...
Congress passed the Public Utility Regulatory Policies Act (PURPA) in November 1978. It was about tw...
Document: The Pacific Southwest Water Plan, A report of the Assembly Interim Committee on Water to t...
The California Energy Commission has been implementing its Public Interest Energy Research (PIER) an...
Document: Pacific Southwest Water Plan "Printed Copy" Chapter V, August 26 ,1963 page 4increase in t...
Document: United States Department of the Interior news release: "Reclamation Tentatively Allocates ...
Pumping Energy and Generation Associated with Proposed Initial Plan Facilities in California--The in...
The estimates of existing, incremental, and the undeveloped hydropower potential for all states in t...