The following Final Geologic Borehole Report briefly describes the drilling of a single borehole at the Waste Treatment Plant (WTP) on the Hanford, Washington, U.S. Department of Energy (DOE) reservation. The location of the WTP is illustrated in Figure 1-1. The borehole was designated as “C4997”, and was drilled to obtain seismic and lithologic data for the Pretreatment Facility and High-Level Waste Vitrification Plant in the WTP. Borehole C4997 was drilled and logged to a total depth of 1428 ft below ground surface (bgs) on October 8, 2006, and was located approximately 150 ft from a recently cored borehole, designated as “C4998”. Pacific Northwest National Laboratory (PNNL) determined the locations for C4997, C4998, and other boreholes a...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
This report presents the results of groundwater monitoring for FY 2006 on DOE's Hanford Site. Result...
Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrolo...
This report describes the 2006 fiscal year field activities associated with the installation of four...
Seismic borehole C4998 was cored through the upper portion of the Columbia River Basalt Group and El...
This report is an environmental evaluation of the impacts of proposed borehole drilling activities a...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
The Pacific Northwest National Laboratory (PNNL) is assembling existing borehole geologic informatio...
Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at...
Two groundwater monitoring wells were drilled at the Hanford Solid Waste Landfill in 1993 and 1994 i...
Three new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed ...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
Two new Resource Conservation and Recovery Act (RCR4) groundwater monitoring wells were installed at...
Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
This report presents the results of groundwater monitoring for FY 2006 on DOE's Hanford Site. Result...
Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrolo...
This report describes the 2006 fiscal year field activities associated with the installation of four...
Seismic borehole C4998 was cored through the upper portion of the Columbia River Basalt Group and El...
This report is an environmental evaluation of the impacts of proposed borehole drilling activities a...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
The Pacific Northwest National Laboratory (PNNL) is assembling existing borehole geologic informatio...
Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at...
Two groundwater monitoring wells were drilled at the Hanford Solid Waste Landfill in 1993 and 1994 i...
Three new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed ...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
Two new Resource Conservation and Recovery Act (RCR4) groundwater monitoring wells were installed at...
Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at...
One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at t...
This report presents the results of groundwater monitoring for FY 2006 on DOE's Hanford Site. Result...
Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrolo...