Preparation of this Engineering Evaluation/Cost Analysis is consistent with the joint U.S. Department of Energy and U.S. Environmental Protection Agency Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation, and Liability Act, which establishes the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action (NTCRA) process as an approach for decommissioning
The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a C...
This engineering study evaluates different alternatives for decontamination and decommissioning of t...
Argonne National Laboratory (ANL) has completed the D&D of the Experimental Boiling Water Reactor (E...
This Action Memorandum documents the selected alternative to perform general decommissioning activit...
Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho...
This Engineering Evaluation/Cost Analysis (EE/CA) has been prepared to fulfill the requirement
The Department of Energy is documenting the selection of an alternative for the TAN-607 Hot Shop Are...
The NRC staff is in need of updated bases documentation that will assist them in assessing the adequ...
On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53...
With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of license...
In 1995, the US Department of Energy (DOE), Richland Operations Office (RL) conducted a removal site...
The NRC staff is in need of decommissioning bases documentation that will assist them in assessing t...
Cost information is developed for the conceptual decommissioning of non-fuel-cycle nuclear facilitie...
The estimated worth of decommissioning optimization planning during each phase of the reactor's life...
During the past seven years, four research reactors at Oak Ridge National Laboratory (ORNL) have bee...
The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a C...
This engineering study evaluates different alternatives for decontamination and decommissioning of t...
Argonne National Laboratory (ANL) has completed the D&D of the Experimental Boiling Water Reactor (E...
This Action Memorandum documents the selected alternative to perform general decommissioning activit...
Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho...
This Engineering Evaluation/Cost Analysis (EE/CA) has been prepared to fulfill the requirement
The Department of Energy is documenting the selection of an alternative for the TAN-607 Hot Shop Are...
The NRC staff is in need of updated bases documentation that will assist them in assessing the adequ...
On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53...
With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of license...
In 1995, the US Department of Energy (DOE), Richland Operations Office (RL) conducted a removal site...
The NRC staff is in need of decommissioning bases documentation that will assist them in assessing t...
Cost information is developed for the conceptual decommissioning of non-fuel-cycle nuclear facilitie...
The estimated worth of decommissioning optimization planning during each phase of the reactor's life...
During the past seven years, four research reactors at Oak Ridge National Laboratory (ORNL) have bee...
The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a C...
This engineering study evaluates different alternatives for decontamination and decommissioning of t...
Argonne National Laboratory (ANL) has completed the D&D of the Experimental Boiling Water Reactor (E...