This report summarizes a series of structural calculations that examine effects of raising the Waste Isolation Pilot Plant repository horizon from the original design level upward 2.43 meters. These calculations allow evaluation of various features incorporated in conceptual models used for performance assessment. Material presented in this report supports the regulatory compliance re-certification, and therefore begins by replicating the calculations used in the initial compliance certification application. Calculations are then repeated for grid changes appropriate for the new horizon raised to Clay Seam G. Results are presented in three main areas: 1. Disposal room porosity, 2. Disturbed rock zone characteristics, and 3. Anhydrite marker...
The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy facility designed to demonstrate...
An important step in the feasibility study of radioactive waste disposal in Boom Clay is the demonst...
Eight alternative methods for approximating salt creep and disposal room closure in a multiphase flo...
An error was discovered in the ALGEBBRA script used to calculate the disturbed rock zone around the ...
Finite element calculations have been performed to determine the structural response of waste-filled...
The US Department of Energy has developed the Waste Isolation Pilot Plant (WIPP) in the bedded salt ...
WIPP, intended for underground permanent disposal of defense transuranic waste, is located 40 km eas...
The US Department of Energy plans to dispose of transuranic waste at the Waste Isolation Pilot Plant...
A long-term assessment of the Waste Isolation Pilot Plant (WIPP) repository performance must conside...
The Department of Energy (DOE) has developed the Waste Isolation Pilot Plant (WIPP) for the purpose ...
The Waste Isolation Pilot Plant (WIPP) is the U.S. Department of Energy`s (DOE) planned repository f...
The DOE submitted a Compliance Certification Application for WIPP in october, 1996. A critical part ...
This report presents the results of numerical analyses to estimate the extent of rock mass modificat...
The Waste Isolation Pilot Plant (WIPP), a facility located in a bedded salt formation in Carlsbad, N...
This report presents the results of studies aimed at assessing the quasi-static behavior of both the...
The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy facility designed to demonstrate...
An important step in the feasibility study of radioactive waste disposal in Boom Clay is the demonst...
Eight alternative methods for approximating salt creep and disposal room closure in a multiphase flo...
An error was discovered in the ALGEBBRA script used to calculate the disturbed rock zone around the ...
Finite element calculations have been performed to determine the structural response of waste-filled...
The US Department of Energy has developed the Waste Isolation Pilot Plant (WIPP) in the bedded salt ...
WIPP, intended for underground permanent disposal of defense transuranic waste, is located 40 km eas...
The US Department of Energy plans to dispose of transuranic waste at the Waste Isolation Pilot Plant...
A long-term assessment of the Waste Isolation Pilot Plant (WIPP) repository performance must conside...
The Department of Energy (DOE) has developed the Waste Isolation Pilot Plant (WIPP) for the purpose ...
The Waste Isolation Pilot Plant (WIPP) is the U.S. Department of Energy`s (DOE) planned repository f...
The DOE submitted a Compliance Certification Application for WIPP in october, 1996. A critical part ...
This report presents the results of numerical analyses to estimate the extent of rock mass modificat...
The Waste Isolation Pilot Plant (WIPP), a facility located in a bedded salt formation in Carlsbad, N...
This report presents the results of studies aimed at assessing the quasi-static behavior of both the...
The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy facility designed to demonstrate...
An important step in the feasibility study of radioactive waste disposal in Boom Clay is the demonst...
Eight alternative methods for approximating salt creep and disposal room closure in a multiphase flo...