Geothermal development can generally be broken down into distinct phases: Exploration and Leasing; Project Development And Feasibility Studies; Well Field Development; Project Finance, Construction and Start-up Operations; and Commercial Operations. Each phase represents different levels of cost and risk and different types of management teams that are needed to assess and manage the project and associated risk. Orderly transitions of management at each major phase are needed. Exploration programs are largely science based, the primary focus of the science based investigations should be to: secure the lease position, and develop sufficient information to identify and characterize an economical geothermal resource. Project development specia...
The specific goal of the NSF geothermal program is the rapid development by industry of the nation's...
Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrat...
One of the most important issues in design of geothermal systems is the management of the project, w...
The views of geothermal development from a utility company standpoint are presented. The impediments...
A geothermal project constitutes two big stages: the exploration and the exploitation. Each one has ...
Geothermal energy has a potential for several applications including geo-exchange, direct thermal ap...
The Federal government's current plans for participation in the geothermal field appear to affect fo...
The use of geothermal energy for direct heat purposes by the private sector within the US has been q...
The report is divided into four chapters which deal, respectively, with the technical and institutio...
In 2005 the Confederated Tribes of Warm Springs Tribal Council authorized an evaluation of the geoth...
US geothermal resources are classified according to resource type and estimates of these resources a...
The commercial development potential of 13 underdeveloped geothermal prospects in the Western United...
Contents: Introduction -- Exploration drilling program and schedule -- Project area/drilling site de...
This is the first annual report of ICF's geothermal R&D project for the Department of Energy's I...
Estate of James Campbell Property TMK 1-2-10:3Attached: "Estimates of air quality for the Wao Kele G...
The specific goal of the NSF geothermal program is the rapid development by industry of the nation's...
Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrat...
One of the most important issues in design of geothermal systems is the management of the project, w...
The views of geothermal development from a utility company standpoint are presented. The impediments...
A geothermal project constitutes two big stages: the exploration and the exploitation. Each one has ...
Geothermal energy has a potential for several applications including geo-exchange, direct thermal ap...
The Federal government's current plans for participation in the geothermal field appear to affect fo...
The use of geothermal energy for direct heat purposes by the private sector within the US has been q...
The report is divided into four chapters which deal, respectively, with the technical and institutio...
In 2005 the Confederated Tribes of Warm Springs Tribal Council authorized an evaluation of the geoth...
US geothermal resources are classified according to resource type and estimates of these resources a...
The commercial development potential of 13 underdeveloped geothermal prospects in the Western United...
Contents: Introduction -- Exploration drilling program and schedule -- Project area/drilling site de...
This is the first annual report of ICF's geothermal R&D project for the Department of Energy's I...
Estate of James Campbell Property TMK 1-2-10:3Attached: "Estimates of air quality for the Wao Kele G...
The specific goal of the NSF geothermal program is the rapid development by industry of the nation's...
Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrat...
One of the most important issues in design of geothermal systems is the management of the project, w...