The C-, F-, K-, and P-Area Coal Pile Runoff Basins (189-C, 289-F, 189-K, and 189-P) (C-, F-, K-, and P-CPRBs) waste units are listed as Resource Conservation and Recovery Act (RCRA) 3004(u) Solid Waste Management Units/Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) units in Appendix C of the Federal Facility Agreement (FFA) for the Savannah River Site (SRS). The C-, F-, K-, and P-CPRBS comprise a single operable unit which was remediated under an early removal action during the summer of 1997. Slightly elevated levels of naturally occurring metals and radionuclides in the coal-laden sediments and shallow soils were confined to the 0-1 foot interval below the basin floor. These source materials were identified ...
Coal storage piles, their associated coal pile runoff basins and ash basins could potentially have a...
This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which function...
This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, ...
The A-Area Burning/Rubble Pits (731-A/1A) and Rubble Pit (731-2A) Operable Unit (OU)(ABRP) is listed...
The D-Area Burning/Rubble Pits (DBRP) (431-D and 431-1D) Waste Unit is listed as a Resource Conserva...
This decision document presents the selected remedial alternative for the FBRP located at the SRS in...
The Savannah River Site (SRS) is a US Department of Energy facility placed on the Superfund National...
An acidic/metals/sulfate, groundwater contaminant plume emanates from the D-Area Coal Pile Runoff Ba...
The D-Area Coal Pile Runoff Basin groundwater plume is acidic and contains heavy metals and sulfate....
The objective of this study was to provide geochemical parameters to characterize the D-Area Coal Pi...
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear S...
The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition op...
This report provides the final hazard categorization for the remediation of six 300-FF-2 Operable Un...
This decision document presents the selected remedial action (no action) for the Bingham Creek, Larg...
This document presents the selected interim remedial action for the TNX Area Groundwater Operable Un...
Coal storage piles, their associated coal pile runoff basins and ash basins could potentially have a...
This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which function...
This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, ...
The A-Area Burning/Rubble Pits (731-A/1A) and Rubble Pit (731-2A) Operable Unit (OU)(ABRP) is listed...
The D-Area Burning/Rubble Pits (DBRP) (431-D and 431-1D) Waste Unit is listed as a Resource Conserva...
This decision document presents the selected remedial alternative for the FBRP located at the SRS in...
The Savannah River Site (SRS) is a US Department of Energy facility placed on the Superfund National...
An acidic/metals/sulfate, groundwater contaminant plume emanates from the D-Area Coal Pile Runoff Ba...
The D-Area Coal Pile Runoff Basin groundwater plume is acidic and contains heavy metals and sulfate....
The objective of this study was to provide geochemical parameters to characterize the D-Area Coal Pi...
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear S...
The 126-B-3 waste site is the former coal storage pit for the 184-B Powerhouse. During demolition op...
This report provides the final hazard categorization for the remediation of six 300-FF-2 Operable Un...
This decision document presents the selected remedial action (no action) for the Bingham Creek, Larg...
This document presents the selected interim remedial action for the TNX Area Groundwater Operable Un...
Coal storage piles, their associated coal pile runoff basins and ash basins could potentially have a...
This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which function...
This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, ...