The geopressured zone, assuming the presence of natural gas and high water productivity, may be used to produce economical electric power only if the water is at least 375 F or a means of conversion more efficient than flashing is found. The design and costing of a double-flash 25-megawatt plant using water at 325 F gave a capital cost of $678/kwh, a fuel cost of 63?/M Btu and a unit power cost of 46 mills/kwh. The conversion efficiency of the plant, including hydraulic turbine energy from the well head overpressure, was 10.3%. This low efficiency accounts for the high unit power cost. A one-well, 1.5-megawatt test facility will require a total capital cost of $6,661,000. Expansion of this site to a four-well, 10-megawatt pilot plant will r...