The Actinide Removal Process (ARP) facility and the Modular Caustic Side Solvent Extraction Unit (MCU) are scheduled to begin processing salt waste in fiscal year 2007. A portion of the streams generated in these salt processing facilities will be transferred to the Defense Waste Processing Facility (DWPF) to be incorporated in the glass matrix. Before the streams are introduced, a combination of impact analyses and research and development studies must be performed to quantify the impacts on DWPF processing. The Process Science & Engineering (PS&E) section of the Savannah River National Laboratory (SRNL) was requested via Technical Task Request (TTR) HLW/DWPF/TTR-2004-0031 to evaluate the impacts on DWPF processing. Simulant Chemical P...
The purpose of this report is to document the acceptability of Sludge Batch 5 with the initial macro...
As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) L...
Phase III simulant flowsheet testing was completed using the latest composition estimates for SB6/Ta...
Two facilities for treating the salt currently being stored in the High Level Waste (HLW) tanks are ...
As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) L...
Prior to processing a Sludge Batch (SB) in the Defense Waste Processing Facility (DWPF), flowsheet s...
The Defense Waste Processing Facility (DWPF) has been vitrifying High Level Waste sludge since 1996....
The Savannah River Site (SRS) is currently on an aggressive program to empty its High Level Waste (H...
As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) L...
An assessment has been made to evaluate the impact on the DWPF melter off-gas flammability of replac...
The Defense Waste Processing Facility (DWPF) will transition from Sludge Batch 3 (SB3) processing to...
Lab-scale DWPF simulations of Sludge Batch 7b (SB7b) processing were performed. Testing was performe...
The Defense Waste Processing Facilities (DWPF) at the Savannah River Site (SRS) is used to process h...
A program was conducted to systematically evaluate potential impacts of the proposed Small Column Io...
As part of the Actinide Removal Process (ARP)/Modular Caustic-side Solvent Extraction Unit (MCU) Lif...
The purpose of this report is to document the acceptability of Sludge Batch 5 with the initial macro...
As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) L...
Phase III simulant flowsheet testing was completed using the latest composition estimates for SB6/Ta...
Two facilities for treating the salt currently being stored in the High Level Waste (HLW) tanks are ...
As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) L...
Prior to processing a Sludge Batch (SB) in the Defense Waste Processing Facility (DWPF), flowsheet s...
The Defense Waste Processing Facility (DWPF) has been vitrifying High Level Waste sludge since 1996....
The Savannah River Site (SRS) is currently on an aggressive program to empty its High Level Waste (H...
As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) L...
An assessment has been made to evaluate the impact on the DWPF melter off-gas flammability of replac...
The Defense Waste Processing Facility (DWPF) will transition from Sludge Batch 3 (SB3) processing to...
Lab-scale DWPF simulations of Sludge Batch 7b (SB7b) processing were performed. Testing was performe...
The Defense Waste Processing Facilities (DWPF) at the Savannah River Site (SRS) is used to process h...
A program was conducted to systematically evaluate potential impacts of the proposed Small Column Io...
As part of the Actinide Removal Process (ARP)/Modular Caustic-side Solvent Extraction Unit (MCU) Lif...
The purpose of this report is to document the acceptability of Sludge Batch 5 with the initial macro...
As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) L...
Phase III simulant flowsheet testing was completed using the latest composition estimates for SB6/Ta...