At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or bioma...
Document: "Appraisal Report Central Arizona Project-Chapter IV", January 1962, page 48available for ...
California energy consumption increased in 1994 in keeping with a recovery from the previous mild re...
The California Energy Commission has been implementing its Public Interest Energy Research (PIER) an...
At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for c...
In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to...
At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small ...
In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 t...
In the Third Quarter of 1982, the number of signed contracts and committed projects rose from 148 to...
The 1979 Biennial Report of the California Energy Commission states that the development of preferre...
Congress passed the Public Utility Regulatory Policies Act (PURPA) in November 1978. It was about tw...
This inventory of small industrial electric generating systems was assembled by The Aerospace Corpor...
The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities inte...
Pumping Energy and Generation Associated with Proposed Initial Plan Facilities in California--The in...
Document: Pacific Southwest Water Plan "Printed Copy" Chapter V, August 26 ,1963 page 4increase in t...
This report details efforts to obtain performance information from existing biomass-toenergy facilit...
Document: "Appraisal Report Central Arizona Project-Chapter IV", January 1962, page 48available for ...
California energy consumption increased in 1994 in keeping with a recovery from the previous mild re...
The California Energy Commission has been implementing its Public Interest Energy Research (PIER) an...
At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for c...
In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to...
At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small ...
In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 t...
In the Third Quarter of 1982, the number of signed contracts and committed projects rose from 148 to...
The 1979 Biennial Report of the California Energy Commission states that the development of preferre...
Congress passed the Public Utility Regulatory Policies Act (PURPA) in November 1978. It was about tw...
This inventory of small industrial electric generating systems was assembled by The Aerospace Corpor...
The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities inte...
Pumping Energy and Generation Associated with Proposed Initial Plan Facilities in California--The in...
Document: Pacific Southwest Water Plan "Printed Copy" Chapter V, August 26 ,1963 page 4increase in t...
This report details efforts to obtain performance information from existing biomass-toenergy facilit...
Document: "Appraisal Report Central Arizona Project-Chapter IV", January 1962, page 48available for ...
California energy consumption increased in 1994 in keeping with a recovery from the previous mild re...
The California Energy Commission has been implementing its Public Interest Energy Research (PIER) an...