A test was conducted to determine the radiation level of several scram shaft assemblies after their removal from the reactor vessel during Core 1 Seed 1 refueling. Data on radiation levels near the assemblies 75 days after shutdown are given. (J.R.D.
Tests at the SM-1 reactor are reported for the period October 1, 1961, to May 31, 1962. Loading chan...
[[abstract]]After 37 years of operation with a total thermal output of 44,456,058 kW hr, the radiati...
With the exception of a brief period of slightly elevated chloride level in the secondary blowdown, ...
A test was made to obtain a record of radiation contamination levels during core I seed 1 refueling ...
A detailed radiation survey of the Shippingport Reactor vessel head was made, and the magnitude of t...
A periodic survey was conducted to determine changes in radiation level in the hairpin loops resulti...
The radiation survey of the Blanket Exit Water Instrumentation assemblies Core I, Seed 1 was perform...
An investigation was conducted to obtain measurements of radiation levels inside the hemispherical h...
The effect of isolation and forced draining on the radiation level of the 1AC coolant purification h...
A test was designed and performed to experimentally determine fuel burnup distribution in the SM-1 C...
An inspection was made of the drive mechanisms for corrosion, crud, pitting, and activity. Localized...
The report describes the results of the first scoping test in the Irradiation Effects Test Series co...
A fuel-element assembly from the first loading of the OMRE was examined in detail after experiencing...
Radiation levels were determined at all permanently installed monitored points in the disposal area....
A fuel-element assembly from the first loading of the OMRE was examined in detail after experiencing...
Tests at the SM-1 reactor are reported for the period October 1, 1961, to May 31, 1962. Loading chan...
[[abstract]]After 37 years of operation with a total thermal output of 44,456,058 kW hr, the radiati...
With the exception of a brief period of slightly elevated chloride level in the secondary blowdown, ...
A test was made to obtain a record of radiation contamination levels during core I seed 1 refueling ...
A detailed radiation survey of the Shippingport Reactor vessel head was made, and the magnitude of t...
A periodic survey was conducted to determine changes in radiation level in the hairpin loops resulti...
The radiation survey of the Blanket Exit Water Instrumentation assemblies Core I, Seed 1 was perform...
An investigation was conducted to obtain measurements of radiation levels inside the hemispherical h...
The effect of isolation and forced draining on the radiation level of the 1AC coolant purification h...
A test was designed and performed to experimentally determine fuel burnup distribution in the SM-1 C...
An inspection was made of the drive mechanisms for corrosion, crud, pitting, and activity. Localized...
The report describes the results of the first scoping test in the Irradiation Effects Test Series co...
A fuel-element assembly from the first loading of the OMRE was examined in detail after experiencing...
Radiation levels were determined at all permanently installed monitored points in the disposal area....
A fuel-element assembly from the first loading of the OMRE was examined in detail after experiencing...
Tests at the SM-1 reactor are reported for the period October 1, 1961, to May 31, 1962. Loading chan...
[[abstract]]After 37 years of operation with a total thermal output of 44,456,058 kW hr, the radiati...
With the exception of a brief period of slightly elevated chloride level in the secondary blowdown, ...